Vietnam: PVN’s General Manager of Exploration Division Visits M/V Amadeus

Vietnam PVNs General Manager of Exploration Division Visits MV Amadeus

On March 21, 2012 in Vung Tau, Doctor of Science (D. Sc.) Phan Tien Vien, the General Manager of Exploration Division, PetroVietnam Oil and Gas Group (PVN), accompanied by the Board of Directors of PTSC G&S, representatives of CGGVeritas has paid a visit to the M/V Amadeus.

Simultaneously, the working group led by D. Sc. Phan Tien Vien had a meeting with Vietnam Register Department aiming to carry out the vessel inspection. This move is a part of action plan to complete the capital contribution procedures of both PTSC and CGGVeritas, getting the Joint Venture between PTSC and CGGVeritas to come into operation officially.

M/V Amadeus is a 3D seismic survey vessel which is capable of towing eight of 8 km-long streamers and modernly equipped. It can be utilized to provide survey services in deep waters all around the world. In 2011, the vessel executed successfully survey projects with highly-appreciated service quality for Oil & Gas Contractors in Vietnam, Myanmar. M/V Amadeus is now registered and converted to sail under the Vietnamese flag (previously, its nationality is French.)

The establishment of the Joint Venture is one of the major projects of PTSC in particular and PVN in general. It is expected that, when coming into operation the Joint Venture shall generate positive effectiveness in both economic and political aspects, taking part in fulfilling the assignment of rendering the whole-system services ranging from upstream to downstream of PTSC.

Subsea World News Staff , March 26, 2012;  Image: PTSC


Share this article

Follow Subsea World News


<< Oct 2015 >>
28 29 30 1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31 1

Offshore Energy Exhibition & Conference 2015

Offshore Energy is an annual event focused on the complete offshore energy industry. It covers both the exploration and production of the…

read more >


The Course includes Practical Electro-Hydraulic Circuit Construction, setting-up procedures, testing & fault diagnosis…

read more >

3P Arctic 2015

The 3P Arctic 2015 Technical Program will consist of 15 to 20 sessions, which are being planned to include 150-160 oral presentations and…

read more >


The Indonesian government aims to increase oil production to one million bpd in the coming years by offering new exploration rights and…

read more >