Denmark: Heerema Hires Boulder for South Arne Field

KONICA MINOLTA DIGITAL CAMERA

BOULDER has been contracted by Heerema for cargo runs and towage of their barge H 302 and Vikingbarge 3 from Flushing to South Arne Field, where Heerema’s HLV BALDER will install a new jacket and topside.

The South Arne platform comprises a combined wellhead, processing and accommodation platform with an oil storage tank on the seabed and buoy loading facilities for oil.

The oil produced is conveyed to an 87,000 m3 storage tank on the seabed. When the tank is full, the oil is transferred to a tanker by means of buoy loading facilities. The gas produced is transported through a gas pipeline to Nybro on the west coast of Jutland.

The South Arne Field has accommodation facilities for 57 persons.

Subsea World News Staff , June 14, 2012;  Image: itc

Share this article

Follow Subsea World News

Events>

<< Jul 2015 >>
MTWTFSS
29 30 1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31 1 2

Deepwater Intervention Forum

The conference named as Deepwater Intervention Forum will cover areas like designing to reduce training time, developing competency in well…

read more >

Marine Warranty Surveying

Marine warranty surveyors ensure that best industry practice and correct procedures are followed in the planning and execution of critical…

read more >

4 week Introduction to ROV Systems

The course has been formulated to provide a basic understanding of how to safely perform operations and maintenance on an ROV system…

read more >

1st EUROPE OIL GAS TRAINING SIMULATION FORUM

The event – unique in its kind around the world – will be an excellent platform for networking, benchmarking, exchanging business ideas…

read more >