The Netherlands: Vos Prodect Receives Order for Sealed Cable Hang-Off Systems

The Netherlands Vos Prodect Receives Order for Sealed Cable Hang-Off Systems

Following the successfully completed sealing tests, Vos Prodect is awarded with a variation order for the supply of Sealed Cable Hang-off Systems for the Offshore wind farm project, that is currently being delivered.

Decision has been given by the developer based on the performed concept tests which met their requirements. Provided leakage rate is within the”water tight” leakage rate classifications.

The sealed cable hang-offs are designed to provide a corrosion free environment inside the cable deck, that results in long term cost saving effect.

This order is a crucial step towards standardizing the sealed cable hang-off system requirements. The sealed system can be implemented to any offshore wind farm project regardless of the cable type.

Press Release, August 07, 2012

Share this article

Follow Subsea World News

Events>

<< Sep 2016 >>
MTWTFSS
29 30 31 1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 1 2

Asia-Pacific Deep Sea Mining Summit 2015

The Asia-Pacific Deep Sea Mining Summit 2015 is the only event of its kind to deliver leading market intelligence and industry presentations…

read more >

Petrotech 2016

The conference content is managed by a committee of industry experts representing NOCs, IOCs, service providers and academia active…

read more >

Subsea 102 / Introduction to BOP MUX Control Systems

A three-day IADC-accredited course that provides a solid comparison and contrast overview of systems, tracking the electrical-hydraulic…

read more >

WindEnergy Hamburg 2016

The international trade fair, WindEnergy Hamburg, will provide a comprehensive overview of the current status and future prospects …

read more >