The Netherlands: Vos Prodect Receives Order for Sealed Cable Hang-Off Systems

The Netherlands Vos Prodect Receives Order for Sealed Cable Hang-Off Systems

Following the successfully completed sealing tests, Vos Prodect is awarded with a variation order for the supply of Sealed Cable Hang-off Systems for the Offshore wind farm project, that is currently being delivered.

Decision has been given by the developer based on the performed concept tests which met their requirements. Provided leakage rate is within the”water tight” leakage rate classifications.

The sealed cable hang-offs are designed to provide a corrosion free environment inside the cable deck, that results in long term cost saving effect.

This order is a crucial step towards standardizing the sealed cable hang-off system requirements. The sealed system can be implemented to any offshore wind farm project regardless of the cable type.

Press Release, August 07, 2012

Share this article

Follow Subsea World News

Events>

<< Sep 2015 >>
MTWTFSS
31 1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 1 2 3 4

POWER-GEN Asia

POWER-GEN Asia has, over its 23 year history, become the leading force in delivering a platform for the power industry to meet, share…

read more >

NATIONAL FLUID POWER CENTRE

The Course includes Practical Electro-Hydraulic Circuit Construction, setting-up procedures, testing & fault diagnosis…

read more >

ROV Pilot Tech

The training facilities include a 10 student electronics lab and a 10 student mechanical workshop all under 2000m2…

read more >

Subsea Management Training

This program focuses on the fundamentals of running a subsea department. Topics include department administration, planning and execution…

read more >