Oregon Coast Buoys Installation Proceedes (USA)

Oregon Coast Buoys Installation Proceedes (USA)

Ocean Power Technologies, Inc. announced that its wholly-owned Oregon subsidiary, Reedsport OPT Wave Park, LLC, has received approval from the U.S. Federal Energy Regulatory Commission (“FERC”) for the full build-out of its planned 1.5 megawatt, grid-connected wave power station off Reedsport, Oregon.

This is the first FERC license for a wave power station issued in the United States and provides an important regulatory approval for the deployment of up to ten (10) OPT devices generating enough electricity for approximately 1,000 homes. Construction of the initial PowerBuoy® is nearing completion and it is expected to be ready for deployment about 2.5 miles off the Reedsport coast later this year. OPT has received funding for this first system from the U.S. Department of Energy, with the support of the Oregon Congressional delegation, and from PNGC Power, an Oregon-based electric power cooperative.

Specifically, FERC has granted a 35-year license for grid-connected, wave energy production. This follows an extensive process of environment assessment, notifications to the public, assessment of Federal and State regulations, and consideration of a broad array of comments, recommendations and terms and conditions.

Charles F. Dunleavy, Chief Executive Officer of OPT, stated, “The issuance of this license by FERC is an important milestone for the U.S. wave energy industry as well as for OPT. It represents the culmination of thorough due diligence and consideration of input from a broad array of groups interested in our Reedsport project. The 35-year term of the license demonstrates the commercial potential of wave power, and this will support initiatives to secure financing for the project. We appreciate the efforts of many who have assisted us during this licensing process, and who recognize its positive significance for the economy and environment of Oregon as well as its coastal communities.”

In August 2010, OPT announced that it had signed a groundbreaking Settlement Agreement (“SA”) with 11 federal and Oregon state agencies and three non-governmental stakeholders for its utility-scale wave power project at Reedsport. FERC gave strong consideration to the agreements set forth in the SA in determining key provisions of the license. The SA supports the responsible, phased development by OPT of a 1.5 megawatt wave energy station in a manner that protects ocean resources and stakeholder interests. It covers a broad array of resource areas including aquatic resources, water quality, recreation, public safety, crabbing and fishing, terrestrial resources, and cultural resources. The SA includes an innovative Adaptive Management Plan that will be used to identify and implement environmental studies that may be required, and to provide a blueprint for the application of this new information as the wave power station develops.

After the initial PowerBuoy is deployed, OPT plans to construct the balance of the wave power station, consisting of up to nine additional PowerBuoys and grid connection infrastructure, subject to receipt of additional funding and all necessary regulatory approvals.

Press Release, August 22, 2012

Share this article

Follow Subsea World News

Events>

<< Feb 2016 >>
MTWTFSS
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 1 2 3 4 5 6

FPSO Europe Congress

 

Pursuing Cost-Optimization & Project Excellence across Europe’s FPSO Value Chain!

Launched to great success in 2015, the FPSO Europe Congress is set to return on 24-25 February 2016 in London for yet another exciting gathering of Europe’s leading oil operators, FPSO contractors, EPCs, shipyards and solution providers to discuss the most topical and critical FPSO developments in the North Sea, Latin America, Brazil and West Africa market.

 

Why Attend the 2nd Annual FPSO Europe Congress?

  • Discover how FPSO leaders are embracing the new realities of a low oil price environment – what are the strategies to adopt in pursuit of viable economical FPSO projects?
  • Brainstorm with industry experts on innovative FPSO engineering, construction and technology breakthroughs leading to significant CAPEX and OPEX savings
  • Review, refine and optimize your existing FPSO operations – how can we enhance oil recovery and extend FPSO asset lifetime?
  • Learn from FPSO experts on the ins-and-outs of delivering successful FSPO projects in North Sea, West Africa, Latin America and Brazil – how can we comply with local content and form effective native partnerships?
  • Engage and form sustainable partnerships with European-based oil companies and FPSO contractors that are leading offshore E&P and FPSO projects in the region

 

2016 FPSO Distinguished Speakers Include:

  • Curtis Lohr, Stones Project Manager, Shell
  • David Hartell, Senior Development Manager, Premier Oil
  • Terry Hughes, Project Director, Tullow Oil
  • Sid Sircar, Facilities Delivery Manager – Catcher Development, Premier Oil
  • Michael Wyllie, Group Technology Director, SBM Offshore
  • Chris Brett, President, Teekay Offshore
  • Puneet Sharma, Vice President, MODEC
  • Eirik Barclay, CEO, Yinson Production

 

The FPSO Europe Congress 2016 is proud to bring you an updated program offering fresh perspectives, creative solutions and critical market intelligence fundamental to FPSO business sustainability as we discuss just HOW and WHAT you can do in pursuit of a viable, efficient and safe FPSO strategy.

For more information please visit the website at http://goo.gl/uvYsrk or email rani.kuppusamy@fpsonetwork.com

 

read more >

Topsides Platforms & Hulls

Topsides, Platforms & Hulls Conference & Exhibition is the offshore industry’s only event dedicated to the topsides, platforms and hulls…

read more >

The 16th North Sea Decommissioning Conference

The 2016-programme has been composed to shed light on the effect of the current low oil-price environment on the decommissioning market…

read more >

Substructures for UK Offshore Wind

Design, construction and installation

Optimising offshore substructures is one of the key challenges for reducing LCOE. Foundation designers have produced a variety of different solutions: monopiles, GBS, jackets, suction buckets and floating foundations. Looking at U.K. projects – different soils, water depths,fabrication timelines and installation challengescreate many questions for the industry to solve. We’re entering uncharted territory; projects arelarger, farther and more complex than ever completed.

Now is the time to have a close look at lessons learnt and define the room for improvement for the U.K. wind industry.

More Info

read more >