Abu Dhabi Crude Oil Pipeline Is Operational

Abu Dhabi Crude Oil Pipeline Is Operational

Pipelines International reported that Abu Dhabi Crude Oil Pipeline, United Arab Emirates, has been commissioned and is now operational.

It is approximately 424 km long, with a 48 inch diameter, consisting of three sections. The subsea section is 13 km long, the offshore section is 19 km long and the onshore section is 405 km long.

The pipeline extends from the Habshan Oil Field to the Fujairah Port.

The company which was awarded the extension of the contract, The International Petroleum Investment Company said: “The scale of the project is immense and encompasses the construction of pumping stations, a main oil terminal and offshore loading facilities at Fujairah, in addition to the installation of the main pipeline.”

Subsea World News Staff, August 30, 2012

Share this article

Follow Subsea World News

Events>

<< Sep 2016 >>
MTWTFSS
29 30 31 1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 1 2

Jee: Pipeline Cleaning for Decommissioning Workshop

The workshop will look in general terms at challenges to pipeline cleaning in the decommissioning phase, how these challenges can be overcome…

read more >

Petrotech 2016

The conference content is managed by a committee of industry experts representing NOCs, IOCs, service providers and academia active…

read more >

SPE Annual Technical Conference and Exhibition

The event will embrace the conference’s heritage of excellence, drawing on the expertise of leading international oil and gas professionals…

read more >

ADVANCED SUBSEA POWER AND HEATING CABLES FOR THE OIL AND GAS INDUSTRY

This conference will establish a common understanding of the challenges and indicate future application and performance of subsea electrical…

read more >