USA: MOSS Reviews Permanent Platform Wire Replacement

USA: MOSS Reviews Permanent Platform Wire Replacement

InterMoor successfully replaced (8) spiral-strand platform wires on a permanent production facility in May 2011 without requiring a platform shutdown or loss of production. The operation was completed using a single Construction Anchor-Handling Vessel (CAHV) at a significant cost savings from the traditional method involving a derrick barge.

Each mooring line consisted of unjacketed spiral-strand wire at the fairlead, two sections of jacketed spiral strand in the water column and studless chain at the seafloor. Syntactic-foam submersible buoys had been installed at each spiral-strand wire connection, so each mooring line had two buoys.

Only the platform wires were to be replaced, and the remaining mooring components including the buoys were to be reused. Protecting the existing components from damage during recovery and reinstallation posed several unique challenges. One of the main operational challenges was to design a way to bring the upper buoy and platform wire out of the water and secure them on deck so that the old platform wire could be disconnected. To accomplish this, InterMoor designed and installed a custom hang-off porch at the CAHV’s stern. The porch used a combination of pneumatic and hydraulic cylinders to manipulate and align the entire porch as each buoy connection was recovered and deployed. The porch also had separate stoppers for the socket connections and a removable cradle for the buoy. Another operational challenge was the unknown condition of the buoys themselves, particularly since they were to be reused on the replacement wires. There was no industry experience at the time in retrieving foam buoys that had remained submerged at depth for over a decade. This paper will explore these challenges and others in more detail as well as the steps that were taken to successfully overcome them.

Press Release, September 07, 2012

Share this article

Follow Subsea World News

Events>

<< Aug 2015 >>
MTWTFSS
27 28 29 30 31 1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31 1 2 3 4 5 6

2nd Annual MEXICO UPSTREAM SUMMIT

Mexico Upstream Summit is official strategic meeting and don’t miss this exciting opportunity to meet and discuss first hand those key issues…

read more >

NATIONAL FLUID POWER CENTRE

The Course includes Practical Electro-Hydraulic Circuit Construction, setting-up procedures, testing & fault diagnosis…

read more >

ROV Pilot Tech

The training facilities include a 10 student electronics lab and a 10 student mechanical workshop all under 2000m2…

read more >

Diploma in Surveying of Offshore Floating Units

This professional development Diploma in Surveying of Offshore Floating Units has been designed to provide the necessary knowledge required…

read more >