The pipeline is progressively lowered to its designated place on the seabed. The Castoro Dieci is laying the shortest segment (28 kilometres) of each of the twin pipelines.
Posted on Sep 24th, 2012 with tags .
The pipeline is progressively lowered to its designated place on the seabed. The Castoro Dieci is laying the shortest segment (28 kilometres) of each of the twin pipelines.