Sevan Brasil Experiences Problems with BOP Control Systems

Sevan Drilling announces that in connection with testing of the blowout preventer (“BOP”) on Sevan Brasil, the company has experienced problems with the BOP control systems.

The company is currently preparing to pull the BOP to the surface to investigate and make required repair.

Sevan Brasil is contracted to Petrobras S.A. on a six year contract for drilling operations offshore Brazil.

The Rig was accepted by Petrobras on 24 July 2012 and spudded it‘s first well on the 31 August in Santos basin at a water depth of 1 800 m.

Press Release, September 24, 2012;  Image: Sevan Drilling

Share this article

Follow Subsea World News

Events>

<< May 2017 >>
MTWTFSS
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31 1 2 3 4

IADC World Drilling 2017 Conference & Exhibition

This event showcases products like Cutting edge, drilling technology, well control, health, safety, environment, training and environment industry…

read more >

Decom Offshore 2017

Decom Offshore 2017 is expected to bring together a global audience of over 400 key representatives from the late life and decommissioning…

read more >

IMCA ROV SEMINAR

This seminar is designed to assist IMCA members in dealing with these, with a programme of technical and operational topics affecting…

read more >

Offshore Wind Energy 2017

In 2017, EWEA and RenewableUK will join forces to bring you the greatest conference and exhibition Europe has ever known in the history…

read more >