Sevan Brasil Experiences Problems with BOP Control Systems

SEVAN BRASIL

Sevan Drilling announces that in connection with testing of the blowout preventer (“BOP”) on Sevan Brasil, the company has experienced problems with the BOP control systems.

The company is currently preparing to pull the BOP to the surface to investigate and make required repair.

Sevan Brasil is contracted to Petrobras S.A. on a six year contract for drilling operations offshore Brazil.

The Rig was accepted by Petrobras on 24 July 2012 and spudded it‘s first well on the 31 August in Santos basin at a water depth of 1 800 m.

Press Release, September 24, 2012;  Image: Sevan Drilling

Share this article

Follow Subsea World News

Events>

<< Jul 2015 >>
MTWTFSS
29 30 1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31 1 2

SPE Offshore Europe

Offshore Europe 2015 (OE 2015) conference and exhibition from the Society of Petroleum Engineers attracts a global audience of engineers…

read more >

Africa International Petroleum Conference & Exhibition (AIPEC) 2015

The conference will cover areas like While the Window of Opportunities Continues to Widen for the Oil and Gas Industry, Creating Immense…

read more >

Deepwater Intervention Forum

The conference named as Deepwater Intervention Forum will cover areas like designing to reduce training time, developing competency in well…

read more >

Subsea UK’s Challenge Cup

Swing for victory as you compete with teams from around the sector in Subsea UK’s Challenge Cup. An opportunity for networking and fun. Includes 18 holes of golf with a shotgun start, starting with bacon rolls, refreshments at the half-way house and concluding with a late lunch and the prize-giving.

More info 

read more >