Sevan Brasil Experiences Problems with BOP Control Systems

SEVAN BRASIL

Sevan Drilling announces that in connection with testing of the blowout preventer (“BOP”) on Sevan Brasil, the company has experienced problems with the BOP control systems.

The company is currently preparing to pull the BOP to the surface to investigate and make required repair.

Sevan Brasil is contracted to Petrobras S.A. on a six year contract for drilling operations offshore Brazil.

The Rig was accepted by Petrobras on 24 July 2012 and spudded it‘s first well on the 31 August in Santos basin at a water depth of 1 800 m.

Press Release, September 24, 2012;  Image: Sevan Drilling

Share this article

Follow Subsea World News

Events>

<< Sep 2015 >>
MTWTFSS
31 1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 1 2 3 4

SPE Offshore Europe

Offshore Europe 2015 (OE 2015) conference and exhibition from the Society of Petroleum Engineers attracts a global audience of engineers…

read more >

NATIONAL FLUID POWER CENTRE

The Course includes Practical Electro-Hydraulic Circuit Construction, setting-up procedures, testing & fault diagnosis…

read more >

ROV Pilot Tech

The training facilities include a 10 student electronics lab and a 10 student mechanical workshop all under 2000m2…

read more >

Subsea Management Training

This program focuses on the fundamentals of running a subsea department. Topics include department administration, planning and execution…

read more >