Sevan Brasil Experiences Problems with BOP Control Systems

SEVAN BRASIL

Sevan Drilling announces that in connection with testing of the blowout preventer (“BOP”) on Sevan Brasil, the company has experienced problems with the BOP control systems.

The company is currently preparing to pull the BOP to the surface to investigate and make required repair.

Sevan Brasil is contracted to Petrobras S.A. on a six year contract for drilling operations offshore Brazil.

The Rig was accepted by Petrobras on 24 July 2012 and spudded it‘s first well on the 31 August in Santos basin at a water depth of 1 800 m.

Press Release, September 24, 2012;  Image: Sevan Drilling

Share this article

Follow Subsea World News

Events>

<< Mar 2015 >>
MTWTFSS
23 24 25 26 27 28 1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 31 1 2 3 4 5

Ocean Business 2015

Ocean Business offers the visitor more than just an international exhibition. The show has an outstanding reputation for its training and…

read more >

Transnational Oil, Gas and Energy Law

Study a Unique Online Learning Programme that is Highly Relevant to Today’s International Market…

read more >

Practical AVO and Seismic Inversion with Petrel

A profitable development of an oil or gas field starts with a good understanding of the subsurface as a basis for efficient and successful…

read more >

Deepwater East & Southern Africa 2015

This event is a two-day conference & exhibition with extensive presentations on all aspects of the East & Southern Africa offshore sector…

read more >