Sevan Brasil Experiences Problems with BOP Control Systems

SEVAN BRASIL

Sevan Drilling announces that in connection with testing of the blowout preventer (“BOP”) on Sevan Brasil, the company has experienced problems with the BOP control systems.

The company is currently preparing to pull the BOP to the surface to investigate and make required repair.

Sevan Brasil is contracted to Petrobras S.A. on a six year contract for drilling operations offshore Brazil.

The Rig was accepted by Petrobras on 24 July 2012 and spudded it‘s first well on the 31 August in Santos basin at a water depth of 1 800 m.

Press Release, September 24, 2012;  Image: Sevan Drilling

Share this article

Follow Subsea World News

Events>

<< Jul 2016 >>
MTWTFSS
27 28 29 30 1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31

SMM 2016

SMM Hamburg 2016 is the leading international forum of the maritime industry.SMM offers the unique chance for exhibitors and trade visitors…

read more >

UK Marine Energy Conference

The UK Marine Energy Conference 2016 focuses on accelerating wave and tidal energy as viable energy alternatives, whilst maintaining the UK…

read more >

Subsea systems

Developing your knowledge of the equipment used, market drivers and issues affecting subsea production, this course covers subsea systems…

read more >

12th Annual Deepwater Intervention Forum

The 12th Annual Deepwater Intervention Forum presented a first-hand look at emerging and proven technologies which offered real-world…

read more >