Sevan Brasil Experiences Problems with BOP Control Systems

Sevan Drilling announces that in connection with testing of the blowout preventer (“BOP”) on Sevan Brasil, the company has experienced problems with the BOP control systems.

The company is currently preparing to pull the BOP to the surface to investigate and make required repair.

Sevan Brasil is contracted to Petrobras S.A. on a six year contract for drilling operations offshore Brazil.

The Rig was accepted by Petrobras on 24 July 2012 and spudded it‘s first well on the 31 August in Santos basin at a water depth of 1 800 m.

Press Release, September 24, 2012;  Image: Sevan Drilling

Share this article

Follow Subsea World News

Events>

<< Apr 2017 >>
MTWTFSS
27 28 29 30 31 1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30

19th Asia Oil and Gas Conference (AOGC 2017)

A high level congregation that needs no introduction, the Event brings forth strategic discourses from global industry captains…

read more >

International Connectivity and Cables Conference

Meet and network with leading telecom operators and OTTs including du, Etisalat, Omantel, Saudi Telecom Company, Yahoo, Angola Cables…

read more >

The 22nd lnternational Offshore Crane and Lifting Conference

The Norwegian Society of Lifting Technology (NSLT) & The Offshore Mechanical Handling Equipment Committee (OMHEC) invite you …

read more >

Offshore Technology Conference (OTC) 2017

The Offshore Technology Conference (OTC) is where energy professionals meet to exchange ideas and opinions to advance scientific…

read more >