Sevan Brasil Experiences Problems with BOP Control Systems

SEVAN BRASIL

Sevan Drilling announces that in connection with testing of the blowout preventer (“BOP”) on Sevan Brasil, the company has experienced problems with the BOP control systems.

The company is currently preparing to pull the BOP to the surface to investigate and make required repair.

Sevan Brasil is contracted to Petrobras S.A. on a six year contract for drilling operations offshore Brazil.

The Rig was accepted by Petrobras on 24 July 2012 and spudded it‘s first well on the 31 August in Santos basin at a water depth of 1 800 m.

Press Release, September 24, 2012;  Image: Sevan Drilling

Share this article

Follow Subsea World News

Events>

<< Jul 2016 >>
MTWTFSS
27 28 29 30 1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31

OSV CHARTERING CONTRACT MANAGEMENT SEMINAR

New revised agenda for 2016, including the following topics:
What happens if hire remains unpaid?…

read more >

12th Annual Deepwater Intervention Forum

The 12th Annual Deepwater Intervention Forum presented a first-hand look at emerging and proven technologies which offered real-world…

read more >

ONS 2016

The ONS Conference is known as one of the world’s most important oil, gas and energy fora, giving the delegates a sneak peek into the future…

read more >

SMM 2016

SMM Hamburg 2016 is the leading international forum of the maritime industry.SMM offers the unique chance for exhibitors and trade visitors…

read more >