Germany: Cuxhaven Underwater Cleanup Plan Unveiled

Germany Cuxhaven Underwater Cleanup Plan Unveiled

Wasser und Schifffahrtsamt Cuxhaven has introduced plans for the underwater clearance works at the Cuxhaven area.

In preparation for the planned channel adjustments in the Lower and Outer Elbe construction site, these clearance works are required.

To this end, several underwater obstacles are needed to be partially or fully removed in addition to a build-up of sedimentation material.

Subsea World News Staff, October 05, 2012; Image: Port of Hamburg

Share this article

Follow Subsea World News

Events>

<< Jun 2016 >>
MTWTFSS
30 31 1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 1 2 3

SMM 2016

SMM Hamburg 2016 is the leading international forum of the maritime industry.SMM offers the unique chance for exhibitors and trade visitors…

read more >

Fundamentals of Subsea Systems

The origins of the subsea sector go back as far as 1940. However, until 1978, subsea systems were quite rudimentary and certainly not suited…

read more >

UK Marine Energy Conference

The UK Marine Energy Conference 2016 focuses on accelerating wave and tidal energy as viable energy alternatives, whilst maintaining the UK…

read more >

12th Annual Deepwater Intervention Forum

The 12th Annual Deepwater Intervention Forum presented a first-hand look at emerging and proven technologies which offered real-world…

read more >