Skandi Africa Arrives at Huisman for Equipment Setup

DOF’s Skandi Africa and its crew have docked at the Huisman Schiedam quayside.

The next months Huisman will install a 650mt Pipelay Tower, a 150mt Knuckleboom Crane and a 900mt Pedestal Mounted Crane onboard the vessel.

In February 2014, Technip chartered a new construction vessel on a long-term basis from DOF Subsea, for delivery in 2015.

The Skandi Africa is a newbuild DP class 3 construction support vessel, designed for harsh environment and deepwater subsea construction and flexlay operations, up to 3,000 m depth.

The 160.9 meters long, VARD OSCV-design vessel, has a 2.700 m2 deck area, under-deck storage capacity of 3,500 Te and two work-class ROVs rated for 4,000 m water depth.

The vessel has a deadweight of 16.000 t  and it can accommodate 140 people.

Share this article

Follow Subsea World News

Events>

<< Feb 2017 >>
MTWTFSS
30 31 1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 1 2 3 4 5

MEOS 2017

The conference typically features over 300 high quality technical presentations, a series of panel sessions led by presidents, vice presidents…

read more >

AOG 2017

The Forum will begin directly after the SUT Subsea Controls DownUnder Conference, drawing a wider audience for our suppliers.This event…

read more >

40th Annual Offshore Pipeline Technology Conference 2017

The conference will cover areas like discuss on pipeline integrity management and life extension strategies for better operational outcomes…

read more >

SNS2017 – The Southern North Sea Conference & Exhibition

EEEGR’s flagship Southern North Sea conference is taking place over two days at the Norfolk Showground Arena in Norwich…

read more >