Hydrex Carries Out Propeller Repair in Uruguay

Photo: Hydrex

Hydrex diver/technician teams performed a propeller blade cropping operation on a 229-meter bulker while the vessel was at anchorage in Punta Del Este, Uruguay. 

After the team arrived at the vessel’s location, they started the underwater operation with a detailed survey of the affected propeller blades. This underwater inspection revealed that three of the four blades were bent severely.

The team used the information acquired during the inspection to calculate and determine the correct measurements needed to modify the tip of the propeller blades.

The divers cropped the damaged blades and ground their edges to give them the correct shape. The fourth blade, which had not been damaged, was also cropped to keep the propeller’s balance.

Share this article

Follow Subsea World News

Events>

<< Jan 2017 >>
MTWTFSS
26 27 28 29 30 31 1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 31 1 2 3 4 5

Oil & Gas IP Summit

The conference will cover areas like Evaluating Best Practice Techniques for IP Portfolio Management and Innovation Strategies,Collaborative…

read more >

European Gas Conference 2017

In recent years the gas market has undergone tremendous shifts with the emergence of new supply sources, the comeback of coal in the power…

read more >

Well Control – Subsea Engineer Programme

The Training Academy’s IADC accredited Subsea Engineer Programme (SSEP) has been recognized by the industry’s major drilling contractors…

read more >

Offshore West Africa 2017

Offshore West Africa 2016 brought together a record-breaking attendance of oil & gas professionals, creating a vibrant networking experience,…

read more >