Jumbo Delivers Normand Maximus VLS

Jumbo’s mv Fairmaster transported a 1,720t vertical lay system (VLS) from La Rochelle in France to Brattvaag in Norway, destined for the largest vessel in Solstad’s fleet.

The VLS, measuring 32x16x44 meters will be one of the main features of the 178 meters long subsea construction vessel Normand Maximus.

The VLS was fully assembled in 6 months time, following its delivery by mv Jumbo Jubilee from Gdynia in Poland.

The BN 830 Normand Maximus arrived at Vard Brattvaag for final outfitting in December 2015. The VLS was shipped in January 2016.

Upon arrival at the port of Brattvaag, the mv Fairmaster placed the VLS, including its foundation, onboard Normand Maximus.

After the delivery in Q2 2016, Normand Maximus will work for Saipem on an 8-year charter agreement.

Share this article

Follow Subsea World News

Events>

<< Mar 2017 >>
MTWTFSS
27 28 1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31 1 2

The 22nd lnternational Offshore Crane and Lifting Conference

The Norwegian Society of Lifting Technology (NSLT) & The Offshore Mechanical Handling Equipment Committee (OMHEC) invite you …

read more >

OMC 2017

OMC mission is serving all people interested in the Mediterranean Offshore Industry…

read more >

Ocean Business 2017

Ocean Business 2015 was phenomenally successful, with visitor numbers up an incredible 29%. The overall attendance was a staggering 4,589…

read more >

International Connectivity and Cables Conference

Meet and network with leading telecom operators and OTTs including du, Etisalat, Omantel, Saudi Telecom Company, Yahoo, Angola Cables…

read more >