Operators Launch MCT Submarine Cable

Telcotech, Malaysia Telekom and Symphony Communication have launched the Malaysia-Cambodia-Thailand (MCT) submarine cable system and landing station in Cambodia.

MCT cable system spans approximately 1,300 kilometers and adopts 100 Gbps technology and will support a capacity of at least 30 Tbps.

The MCT submarine cable will connect to other submarine cable systems, including Telcotech – the only Cambodian member of the Asia-America Gateway – and the 20,000 kilometre submarine communication cable which links Southeast Asia to the USA.

The system makes use of landing stations, of which Cambodia’s landing station called “Mittapheap Landing Station” is located at Otres Beach in Sihanoukville, while Malaysia’s is in Cherating, and at Rayong for Thailand.

Huawei Marine was contracted to design and deploy the system.

Share this article

Follow Subsea World News

Events>

<< Mar 2017 >>
MTWTFSS
27 28 1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31 1 2

The 22nd lnternational Offshore Crane and Lifting Conference

The Norwegian Society of Lifting Technology (NSLT) & The Offshore Mechanical Handling Equipment Committee (OMHEC) invite you …

read more >

OMC 2017

OMC mission is serving all people interested in the Mediterranean Offshore Industry…

read more >

Ocean Business 2017

Ocean Business 2015 was phenomenally successful, with visitor numbers up an incredible 29%. The overall attendance was a staggering 4,589…

read more >

International Connectivity and Cables Conference

Meet and network with leading telecom operators and OTTs including du, Etisalat, Omantel, Saudi Telecom Company, Yahoo, Angola Cables…

read more >