Fugro Gears for Gwynt y Môr Survey in April

Geophysical survey operations are due to be carried out in and around the Gwynt y Môr offshore wind farm during early April 2017, AWJ Marine informs.

The vessel MV Meridian will carry out a geophysical survey over a period of up to 7 days, starting on April 4, 2017. However, the start date and duration of the survey may be affected by weather and sea conditions.

The survey work will involve both sidescan and multibeam sonar surveys. During sidescan survey work MV Meridian may be towing equipment up to 100 metres behind the vessel. The vessel will be mobilising from Liverpool and will operate on a 24 hour basis.

Throughout survey operations the vessel will display the appropriate lights and shapes and will require other vessels to maintain a wide berth of at least 500 metres.

The exact timing of the survey may be affected by the prevailing weather and sea conditions.

Share this article

Follow Subsea World News

Events>

<< Apr 2017 >>
MTWTFSS
27 28 29 30 31 1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30

3rd Deepwater East & Southern Africa Congress 2017

The past successful two series has gathered around 600 industrial professionals, while most of which thought this event informative and useful…

read more >

Offshore Technology Conference (OTC) 2017

The Offshore Technology Conference (OTC) is where energy professionals meet to exchange ideas and opinions to advance scientific…

read more >

OFFSHORE WIND CONNECTIONS 2017

The focus of OWC2017 is on the Yorkshire and the Humber region, which is at the epicentre of the offshore wind industry, and where billions…

read more >

19th Asia Oil and Gas Conference (AOGC 2017)

A high level congregation that needs no introduction, the Event brings forth strategic discourses from global industry captains…

read more >