Fugro Gears for Gwynt y Môr Survey in April

Geophysical survey operations are due to be carried out in and around the Gwynt y Môr offshore wind farm during early April 2017, AWJ Marine informs.

The vessel MV Meridian will carry out a geophysical survey over a period of up to 7 days, starting on April 4, 2017. However, the start date and duration of the survey may be affected by weather and sea conditions.

The survey work will involve both sidescan and multibeam sonar surveys. During sidescan survey work MV Meridian may be towing equipment up to 100 metres behind the vessel. The vessel will be mobilising from Liverpool and will operate on a 24 hour basis.

Throughout survey operations the vessel will display the appropriate lights and shapes and will require other vessels to maintain a wide berth of at least 500 metres.

The exact timing of the survey may be affected by the prevailing weather and sea conditions.

Share this article

Follow Subsea World News

Events>

<< Jun 2017 >>
MTWTFSS
29 30 31 1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 1 2

Oil & Gas Indonesia 2017

Oil & Gas Indonesia (OGI) is an exhibition focused on Oil and Gas Exploration, Production and Refining and showcases the largest exhibition…

read more >

IADC World Drilling 2017 Conference & Exhibition

This event showcases products like Cutting edge, drilling technology, well control, health, safety, environment, training and environment industry…

read more >

OGA 2017

OGA 2017 is the most beneficial way to meet, discuss and acquire the latest in the Oil & Gas industry! It is also;…

read more >

SPE Offshore Europe 2017

Attending SPE Offshore Europe, recognised by offshore E&P professionals as Europe’s leading E&P exhibition and conference, will ensure…

read more >