Fugro Gears for Gwynt y Môr Survey in April

Geophysical survey operations are due to be carried out in and around the Gwynt y Môr offshore wind farm during early April 2017, AWJ Marine informs.

The vessel MV Meridian will carry out a geophysical survey over a period of up to 7 days, starting on April 4, 2017. However, the start date and duration of the survey may be affected by weather and sea conditions.

The survey work will involve both sidescan and multibeam sonar surveys. During sidescan survey work MV Meridian may be towing equipment up to 100 metres behind the vessel. The vessel will be mobilising from Liverpool and will operate on a 24 hour basis.

Throughout survey operations the vessel will display the appropriate lights and shapes and will require other vessels to maintain a wide berth of at least 500 metres.

The exact timing of the survey may be affected by the prevailing weather and sea conditions.

Share this article

Follow Subsea World News

Events>

<< Oct 2017 >>
MTWTFSS
25 26 27 28 29 30 1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 31 1 2 3 4 5

Deepwater Operations Conference & Exhibition

The Deepwater Operations Conference and Exhibition provides a unique experience for attendees and exhibitors to share…

read more >

24th Annual Africa Oil Week 2017

The Conference portraying five days of senior-level executive insights, with rich-content on corporate strategies and portfolio, exposure…

read more >

OTC Brasil 2017

OTC Brasil is organized by the Offshore Technology Conference (OTC) and Brazilian Petroleum, Gas and Biofuels Institute (IBP)…

read more >

Rio Pipeline 2017

Rio Pipeline Conference & Exhibition has changed its branding design, to unify the whole pipeline community, in an even more complete event…

read more >