PHOTO: Maersk Connector Executes Its First Engineered Grounding

Maersk Connector has performed its first engineered grounding at Walney out of Heysham in the West of England.

This operation was the first ever for Maersk Connector and the first in Maersk Supply Service’s history. The onshore cable-laying capability was carried out together with client DeepOcean.

The vessel went in with the high tide and grounded again with the low tide, using strategic anchor lines to hold position during the operation. Over the course of three days the Maersk Supply Service Captain and crew successfully grounded Maersk Connector five times to connect a subsea cable line to onshore facilities.

“Maersk Connector’s special features have been developed with the aim of adding value to the client’s operation, and it is very rewarding for us as a vessel owner to have Maersk Connector as part of our 40-plus strong fleet and offer her highly exclusive cable-laying capabilities to DeepOcean.” -MSS COO, Claus Bachmann.

Share this article

Follow Subsea World News

Events>

<< Jun 2017 >>
MTWTFSS
29 30 31 1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 1 2

Oil & Gas Indonesia 2017

Oil & Gas Indonesia (OGI) is an exhibition focused on Oil and Gas Exploration, Production and Refining and showcases the largest exhibition…

read more >

IADC World Drilling 2017 Conference & Exhibition

This event showcases products like Cutting edge, drilling technology, well control, health, safety, environment, training and environment industry…

read more >

OGA 2017

OGA 2017 is the most beneficial way to meet, discuss and acquire the latest in the Oil & Gas industry! It is also;…

read more >

SPE Offshore Europe 2017

Attending SPE Offshore Europe, recognised by offshore E&P professionals as Europe’s leading E&P exhibition and conference, will ensure…

read more >