UK: Hydratight Launches Updated Emergency Pipeline Repair System

Hydratight has launched an updated Emergency Pipeline Repair System to offer better disaster planning and contingency services to operators and contractors.

Following the dramatic reaction to the Gulf disaster in early 2011, ever-increasing demands are being placed on oil and gas operators to provide safer, faster and more effective contingency plans to react to major accidents. The potential for environmental damage of subsea pipelines requires a critical level of risk management and repair planning.

For over 20 years, Hydratight’s MORGRIP mechanical connector has provided the world standard for weldless pipeline tie-in, repair and emergency contingencies both topside and subsea.

The tailored Emergency Pipeline Repair System (EPRS) provides a way for operators and installation contractors to meet their pipeline contingency needs with greater urgency.

By joining the EPRS “club”, operators and contractors gain guaranteed highest-priority treatment and fast delivery of the required MORGRIP device and expert installation asistance, if required.

Hydratight joins member-companies in preparing a full list of MORGRIP and associated engineering needs, offers designs for type approval and regularly updates this infor-mation. Members also get advance knowledge of the likely cost of instituting the full repair.

“This means much of the delay at the front end of the repair — the design specification, the approvals procedure, costings, and all the other associated advance work — is largely eradicated,” said Hydratight’s connector product manager Paul Hughes.

Once assessment of the member’s needs is completed, Hydratight ensures the steel stock, machining and engineering teams are allocated and always in readiness. To prove system readiness, the EPRS team provides regular paper exercises with the client to ensure the service will run exactly as intended should a genuine emergency arise.

The service already numbers several very large operators among its club members and even companies offering complementary emergency services, where MORGRIP is an integral part of a larger repair.

“Even as few as five years ago, Hydratight would need to quote up to two months to deliver one of the larger MORGRIP connectors — even in an emergency — because of the need to get approvals and costings and to assemble the many parts and order the machining necessary,” said Paul.

“These days, club members can look forward to receiving the finished connector in as few as two or three weeks — well within even the sort of shrunken timescales forced on companies by environmental and political expediency. This sort of emergency response means a major accident can be cleared much more quickly yet with the same dedication to safety.”

Subsea World News Staff , February 29, 2012;  Image: Hydratight

Share this article

Follow Subsea World News

Events>

<< Dec 2017 >>
MTWTFSS
27 28 29 30 1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31

Underwater Intervention 2018

UI 2018 will draw the industry’s leaders from across the country and around the globe to gather for 3 days of networking…

read more >

Future Energy Asia Exhibition & Conference (FEA) 2018

The transformation and development of Thailand is a major priority for the government which creates incredible business opportunities…

read more >

HYPACK 2018

This training event will offer instruction on the newest features of HYPACK® 2018 as well as comprehensive training for both novice…

read more >

European Gas Conference 2018

The European Gas Conference celebrated its tenth anniversary amid an air of increasing optimism following considerably shifting markets in the last few years…

read more >