Ekofisk Field to Remain in Production Far Longer Than Originally Planned

Ekofisk Field to Remain in Production Far Longer Than Originally Planned

ConocoPhillips Skandinavia AS has received consent to use the Ekofisk 2/4 Z facility on the Ekofisk field.

The Ekofisk field will remain in production far longer than originally planned when the field was first put into production in 1970. This has created a need for a new production facility, Ekofisk 2/4 Z.

Ekofisk 2/4 Z is a wellhead facility which will be connected by a gangway to the Ekofisk Complex, where the wellstream will be processed. This new facility is designed for a working life of 40 years.

ConocoPhillips, the operator at Ekofisk, is planning 36 wells for the facility. The wells are to be drilled using a jack-up facility that will be installed adjacent to the wellhead facility during the drilling phase. ConocoPhillips will apply for separate consent for use of the drilling facility before drilling starts.

Press Release, November 12, 2013; Image: ConocoPhillips

 

Share this article

Follow Subsea World News

Events>

<< Apr 2015 >>
MTWTFSS
30 31 1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 1 2 3

Ocean Business 2015

Ocean Business offers the visitor more than just an international exhibition. The show has an outstanding reputation for its training and…

read more >

Transnational Oil, Gas and Energy Law

Study a Unique Online Learning Programme that is Highly Relevant to Today’s International Market…

read more >

Practical AVO and Seismic Inversion with Petrel

A profitable development of an oil or gas field starts with a good understanding of the subsurface as a basis for efficient and successful…

read more >

Deepwater East & Southern Africa 2015

This event is a two-day conference & exhibition with extensive presentations on all aspects of the East & Southern Africa offshore sector…

read more >