Aker Solutions Secures EPMA Work at Johan Sverdrup

Aker Solutions Secures EPMA Work at Johan Sverdrup

Aker Solutions will provide engineering, procurement and management assistance services for five years at the Statoil-operated Johan Sverdrup development in the Norwegian North Sea.

The EPMA work, valued at NOK 4.5 billion, is part of a 10-year framework accord announced in December 2013 and comes after Statoil decided to exercise an option. The assignment will last through 2019 and covers work in the development’s first phase.

“Johan Sverdrup will define the oil industry in Norway and play a large part in our company’s growth for years to come,” said Luis Araujo, Aker Solutions’ chief executive officer. “We are sparing no effort and working in close cooperation with the field’s partners to ensure the development is second to none.”

Aker Solutions last year delivered the front-end engineering and design work for the development’s first phase, consisting of four platforms linked by bridges. The EPMA work for phase one is anticipated at its peak to involve more than 1,000 employees at Aker Solutions’ engineering hubs in Oslo, London and Mumbai.

The field, the largest offshore oil find in Norway in 30 years, is estimated to hold 1.8 billion to 2.9 billion barrels of oil equivalents. It’s expected to produce 550,000 - 650,000 barrels of oil equivalents a day when fully developed, equal to about a quarter of current domestic output. Production is slated to start in late 2019 and is predicted to last for about half a century.

Statoil is operator for the development, which spans three licenses. Other partners include Lundin Norway, Petoro, Maersk Oil and Det norske oljeselskap.

“We’re proud to expand on our close relationship with Statoil that has been built over many years of offshore development,” said Per Harald Kongelf, head of Aker Solutions in Norway. “It’s also gratifying to work with so many other partners, which is a testament to the importance of this project.”

A key focus of the project team is to identify ways to reduce costs and improve the overall efficiency of the development.

“Finding cost-efficient and sustainable solutions is absolutely necessary and we will keep working with the license partners to do this through a systematic and ambitious improvement program,” said Aker Solutions’ Head of Engineering Valborg Lundegaard.

Press Release; Image: Statoil

Share this article

Follow Subsea World News

Events>

<< Jan 2016 >>
MTWTFSS
28 29 30 31 1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31

Topsides Platforms & Hulls

Topsides, Platforms & Hulls Conference & Exhibition is the offshore industry’s only event dedicated to the topsides, platforms and hulls…

read more >

20th Annual Offshore West Africa

The conference will provide the latest technological innovations, solutions and lessons learned from leading industry professionals and will…

read more >

2nd Annual Offshore Power Cable Engineering and Reliability Forum

This exclusive BIS forum will showcase an analytical insights into how industry leaders are reducing risk and improving efficiency during offshore power cable installation. Participants will learn how to increase cable integrity and manage cost during offshore projects. This interactive forum will explore effective and safe maintenance of offshore cables in deeper, harsher environments. With a two day intimate forum followed by half a day workshop, joining together key industry professionals to discuss, brainstorm, share experience and partake in exclusive networking sessions in a flexible and dynamic platform – together shaping the future of the market.

As Europe strives to meet its 2020 renewable targets the need for infrastructure increases and the integration of renewable energy into the European grid along with the necessity for trade is of huge importance. HVDC offshore cables are a vital investment; both of time and money, and any challenges arising could result in operational and financial losses. An insight on how to efficiently cope with the changes and keeping up with market trends is needed.

This BIS GROUP Forum will allow leading electricity cable and interconnection players to exchange and discuss experience on reliable offshore power cable monitoring, protection strategies, repair and installation technologies that are vital for operating in cost-efficient manner. The forum will also provide solutions and strategies on how to overcome the challenges of laying and installing of offshore power cables in deep water / far offshore.

KEY TOPICS INCLUDE:

  • Deepen your insight into the latest cable design advancements
  • Identify the latest technological innovations in cable laying & installation projects
  • Explore the possibilities of dynamic cables and deep water installation
  • Discover new generation of cost effective burial and trenching methods
  • Ease your cable protection strategy and save your resources
  • Explore how to use the latest monitoring and testing techniques to enhance cable repair
  • Gain invaluable insight into the latest maintenance methodologies to achieve cable integrity and reduce cost
  • Benefit from expert opinion on predictive and preventative maintenance strategy
  • Examine vessel capabilities and availabilities in offshore projects
  • Receive clarification on the roles and responsibilities of Marine Warranty Surveyor
  • Take advantage of an excellent opportunity to meet other stakeholders in an informal setting

More Info

read more >

Subsea South West Networking Event in Bristol

The event is being organised with a view to establish a Subsea South West group, to share information and services among companies which…

read more >