Interwell’s Aberdeen Test Facility Open for Hire

Well intervention specialist, Interwell, is opening its test facility for hire in Aberdeen for companies to fulfil their testing requirements.

The facility, with six hydrostatic test lines and two gas test lines, can primarily test downhole tools to ISO14310 validation grades, with maximum pressure and temperature testing capabilities of 20,000psi and 200°C. It can be also used for custom pre-installs and testing.

According to the company, the test pit is 15.5m long x 1.8m wide and is 1.8m below ground level, with a 5 tonne overhead crane. A Ram for tension and compression loads up to 341 tonnes is also available, as well as a steam cleaning facility, and a well-equipped workshop area which can be used in preparation for and during testing.

Interwell’s testing facility was built in 2013 and to date, over 75 tests have been carried out.

Headquartered in Norway, Interwell also has offices in the UK, the Middle East, the Far East and USA, employing more than 350 people globally and supporting operations around the world.

Share this article

Follow Subsea World News

Events>

<< Dec 2017 >>
MTWTFSS
27 28 29 30 1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31

Underwater Intervention 2018

UI 2018 will draw the industry’s leaders from across the country and around the globe to gather for 3 days of networking…

read more >

Future Energy Asia Exhibition & Conference (FEA) 2018

The transformation and development of Thailand is a major priority for the government which creates incredible business opportunities…

read more >

HYPACK 2018

This training event will offer instruction on the newest features of HYPACK® 2018 as well as comprehensive training for both novice…

read more >

European Gas Conference 2018

The European Gas Conference celebrated its tenth anniversary amid an air of increasing optimism following considerably shifting markets in the last few years…

read more >