Mojo Protects Wave Hub Export Cable

This Easter Weekend has seen Mojo Maritime successfully complete the installation of cable protection works off the North Cornwall coast.

The operation consisted of accurately placing rock filled filter units from the DP2 vessel Stril Explorer to create a protection berm for the Wave Hub 33KV export cable.

The filter unit consists of a CE approved fibre mesh bag complying with Eco-Mark requirements containing 2 tonnes of aggregate.

As the filled bags adopt the profile of the seabed when lowered, they can be used to construct protection measures without the need for seabed preparation and are easily handled due to the certified lifting eyes incorporated into the unit.

In order to achieve the centimetre positional tolerances required for this project, Mojo Maritime designed a specialist lifting beam incorporating remotely actuated lifting pins capable of lifting two units at a time and placing them accurately to meet the protection measure design. This enabled 105 filled units to be placed in position within 14 hours, despite experiencing poor subsea visibility.

 

Share this article

Follow Subsea World News

Events>

<< Nov 2015 >>
MTWTFSS
26 27 28 29 30 31 1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 1 2 3 4 5 6

European Autumn Gas Conference

The European Autumn Gas Conference 2015 will celebrate its 30th anniversary in Geneva, Switzerland where it all started 29th years ago!…

read more >

Marine Warranty Surveying

This distance learning course addresses the core competencies of warranty surveying, presenting the background knowledge and practical…

read more >

HYDRO2015 Conference & Exhibition

HYDRO2015 will seek to bring the international hydrographic community together to learn about the latest techniques and developments…

read more >

Maritime Africa

- Building African maritime economies
- Improved African Maritime Domain Awareness
- Collaboration and Cooperation for a secure African Maritime Domain…

read more >