Heerema Starts Mooring Setup at Ichthys

Mooring installation works have begun at the Ichthys Field in the Browse Basin about 220 kilometres offshore Western Australia as part of the INPEX-operated Ichthys LNG Project’s ongoing offshore installation campaign.

The first of 49 foundation piles was safely deployed and driven into the seabed on Wednesday May 6, 2015 in a water depth of 250 metres. Each pile is about 66 metres long and weighs more than 450 tonnes.

Ichthys Project Managing Director Louis Bon said that installation of the complex network of subsea infrastructure and equipment across the 800 square kilometre Ichthys Field was progressing well.

“The mooring installation works are part of the offshore installation campaign that the Ichthys LNG Project commenced in October 2014,” Bon said.

“As part of that campaign, we are installing more than 30,000 tonnes of subsea infrastructure and equipment across the Ichthys Field so that we will be able to safely and efficiently extract gas and condensate.”

“The mooring work is being carried out specifically to prepare for the arrival of the Project’s two big offshore facilities – the central processing facility and the floating production, storage and offloading facility.”

Currently under construction in South Korea, the central processing facility (CPF) and floating production, storage and offloading (FPSO) facility, once completed, will be towed to the Ichthys Field in 2016 and moored for the life of operations, about 40 years, by 40,000 tonnes of chain secured to about 20,000 tonnes of foundation piles.

The mooring installation work scope is being led by Heerema Marine Contractors (HMC) Australia, under subcontract to the lead contractor McDermott Australia, using the deepwater construction vessel DCV Aegir.

Moorings will be installed by DCV Aegir in non-continuous phases, with piles driven first and mooring chains laid out later in the campaign.

As of May 2015, the Ichthys LNG Project had installed 47 kilometres of flowlines, more than 30 flowline sleeper structures and a 6500 tonne riser support structure (RSS) in the Ichthys Field as part of the offshore installation campaign.

Share this article

Follow Subsea World News

Events>

<< Jul 2017 >>
MTWTFSS
26 27 28 29 30 1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31 1 2 3 4 5 6

Kuwait Oil & Gas Show

Kuwait Oil & Gas Show is the Kuwait International Fair Ground in Kuwait City, Kuwait. This event showcases product from Chemicals & Dyes, Electronics & Electrical Goods, Hand, Machine & Garden Tools, Petroleum, Oil & Gas, Power & Renewable Energy industries. More info

read more >

SPE Offshore Europe 2017

Attending SPE Offshore Europe, recognised by offshore E&P professionals as Europe’s leading E&P exhibition and conference, will ensure…

read more >

Offshore Site Investigation & Geotechnics Committee 8th International Conference “Smarter Solutions for Future Offshore Developments”

The conference series, which has run since 1979, offers a unique opportunity for geotechnical engineers, geoscientists and academics…

read more >

Oil & Gas Indonesia 2017

Oil & Gas Indonesia (OGI) is an exhibition focused on Oil and Gas Exploration, Production and Refining and showcases the largest exhibition…

read more >