Telebras, IslaLink to Build Brazil-Europe Subsea Cable

Telebras, IslaLink to Build Brazil-Europe Subsea Cable

Brazilian Telebras SA and Spanish IslaLink signed on Tuesday (June 30) an agreement for the construction of submarine cable linking the South American continent with Europe.

The joint venture will consist of Telebras with 35% interest, IslaLink with 45% and a third Brazilian holder to be determined later, with 20% interest.

The agreement was signed by the president of Telebras, Jorge Bittar, and the president of IslaLink, Alfonso Gajate, in front of by the Minister of Communications, Ricard Berzoini.

The ceremony also was attended by the ambassador of the European Union, Ana Paula Zacarias, and the ambassador of Spain, Manuel de la Cámara Hermoso.

Bittar pointed out the importance of submarine cable for Brazilian and European communications, facilitating data traffic between the two continents.

He also informed that the cable will have a length of 5875 km, linking the cities of Fortaleza and Lisbon.

The president of IslaLink, Alfonso Gajate also stressed the importance of submarine cable for European and South American connections, remembering that there is a pent-up demand for use by many companies, organizations and academic and scientific institutions.

The cable will provide more than 30 terabits per second (Tbps) of capacity and will require a $185 million investment to link Brazil to Europe.

Subsea World News Staff

Share this article

Follow Subsea World News

Events>

<< Oct 2016 >>
MTWTFSS
26 27 28 29 30 1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31 1 2 3 4 5 6

4th Offshore Indonesia Convention 2016

4th Offshore Indonesia Convention 2016 will examine the latest regulation in building an attractive investment climate for foreign…

read more >

Offshore Marintec Russia

The new event runs in even-numbered years and is a conceptual follow-up of the most famous national shelf development forum RAO/CIS Offshore…

read more >

Subsea pipelines

This course is essential for subsea engineers or if you are new to the industry. From design, through installation and operation to…

read more >

OFFSHORE WIND SUBSTATION AND RELIABILITY FORUM

This 2-day small-scale meeting consists of in-depth panel discussions, practical case studies, interactive sessions and workshops, where…

read more >