EuroAsia InterConnector Moves Step Closer

Photo: EuroAsia InterConnector

The EuroAsia InterConnector project has moved a step closer with new studies awarded to Italian CESI S.p.A. and GAS S.r.l, during a ceremony held at the European Parliament Office in Cyprus.

As Cyprus Mail reports, the studies are for the technical design, the reconnaissance study for the optimum route, and an environmental impact study.

The studies for the subsea cable linking Cyprus and Israel to Europe are expected to be completed in 2016.

The cable consists of an approximately 1518 km long 400 kV interconnector with a capacity of around 2000 MW.

The work on the first portion of cable between Israel and Cyprus is expected to start in 2017. The work is planned to be completed in 2019.

In the second stage of work, the operator plans to connect Greek island of Crete to Attica in mainland Greece in 2020.

The final stage consists of connecting Cyprus and Crete.

The EuroAsia InterConnector is initiated by the DEI-Quantum Energy, a joint venture between DEI and Quantum.

Subsea World News Staff

Share this article

Follow Subsea World News

Events>

<< Nov 2017 >>
MTWTFSS
30 31 1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 1 2 3

OFFSHORE DECOMMISSIONING CONFERENCE 2017

The conference will build upon previous sell-out events and will encompass numerous keynote sessions all focused on the latest decommissioning…

read more >

Europort 2017

Europort has a strong focus on special purpose ships including offshore vessels, dredging vessels, construction vessels, naval vessels…

read more >

OVC 2017

Benefit from quality content and unrivalled networking opportunities offered by OVC Global 2017…

read more >

The Abu Dhabi International Petroleum Exhibition & Conference (ADIPEC)

The Abu Dhabi International Petroleum Exhibition and Conference (ADIPEC) provides an unrivalled global platform for oil and gas professionals…

read more >