IHC Designs New Inter-Array Cable Layer

ihc_inter_array_cable_lay_vessel

IHC has introduced a new inter-array cable-laying vessel designed to facilitate more efficient offshore wind farm installations.

The vessel is approximately 106 meters long with breath of 22 meters.

According to IHC, the new design should reduce costs for inter-array cable-laying operations by 20 to 30%.

The vessel is equipped with two 1,250t carousels below deck, which can be loaded simultaneously.

Cable storage below deck leaves space for an inline quadrant with a 50m track, making operations in deeper water possible. Containers to store the cable protection systems are positioned around the quadrant to ensure a safe and efficient flow of materials.

Share this article

Follow Subsea World News

Events>

<< Sep 2017 >>
MTWTFSS
28 29 30 31 1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 1

Kuwait Oil & Gas Show

Kuwait Oil & Gas Show is the Kuwait International Fair Ground in Kuwait City, Kuwait. This event showcases product from Chemicals & Dyes, Electronics & Electrical Goods, Hand, Machine & Garden Tools, Petroleum, Oil & Gas, Power & Renewable Energy industries. More info

read more >

Offshore Site Investigation & Geotechnics Committee 8th International Conference “Smarter Solutions for Future Offshore Developments”

The conference series, which has run since 1979, offers a unique opportunity for geotechnical engineers, geoscientists and academics…

read more >

Oil & Gas Indonesia 2017

Oil & Gas Indonesia (OGI) is an exhibition focused on Oil and Gas Exploration, Production and Refining and showcases the largest exhibition…

read more >

EEMUA subsea engineering course: materials selection and corrosion control

This two and a half day training course is recommended for both discipline and project focused engineers from a variety of backgrounds…

read more >