Break on OpenHydro Turbine Delays Bay of Fundy Project

Cape Sharp Tidal has experienced a delay with its Bay of Fundy project, due to an issue with the OpenHydro turbine.

OpenHydro discovered an issue with the metal properties of a fastening component in its Open-Centre Turbines.

Following the lab testing, OpenHydro confirmed that a risk exists with the long term durability of the component that was traced back to supplier.

The components are used to secure part of the turbine generator in position, and could fail prematurely if not replaced, so the company decided to replace the components in the Open-Centre Turbines.

“Of key importance is that this is not an issue with the turbine design, rather a matter of incorrectly supplied components. Part of the purpose of this demonstration phase is to identify all potential issues, and OpenHydro is taking the appropriate steps to remedy the issue,” Cape Sharp Tidal said.

OpenHydro is currently considering options for replacing the components in turbine 1, the company added.

Share this article

Follow Subsea World News

Events>

<< Dec 2019 >>
MTWTFSS
25 26 27 28 29 30 1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 31 1 2 3 4 5

M&CCE Expo Marine & Coastal Civil Engineering 2020

This conferences, events, demos, and competitions provide a productive background buzz throughout M&CCE…

read more >

Underwater Intervention (UI) 2020

Underwater Intervention Conference is a conference where oil and gas industry professionals, senior decision…

read more >

Subsea Expo 2020

Subsea Expo is the world’s largest subsea exhibition and conference and is completely free to attend.

read more >

Oceanology International 2020

Exhibitors from industry, government and research institutions share their knowledge and come…

read more >