Jan De Nul Hires Seaproof Solutions to Protect Cables of Two OWFs

Seaproof Solutions has been awarded a contract by Jan De Nul to supply its export cable protection systems for offshore wind farms Borkum Riffgrund 2 and Trianel Windpark Borkum 2nd construction phase.

The contract covers the design and supply of the export cable protection systems connecting the Borkum Riffgrund 2 wind farm to the DolWin gamma platform; and the Trianel Windpark Borkum 2nd construction phase wind farm to the DolWin alpha platform.

CPS are taking into account all pertinent cable data, physical interface to the foundations and environmental parameters, whilst guaranteeing a minimum design life of 30 years.

Share this article

Follow Subsea World News

Events>

<< Sep 2019 >>
MTWTFSS
26 27 28 29 30 31 1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 1 2 3 4 5 6

Europort 2019

Europort, organised in the world port city of Rotterdam, will be the leading exhibition for special purpose vessels…

read more >

2019 SPE Annual Technical Conference and Exhibition (ATCE)

As one of the largest gatherings of E&P professionals, ATCE includes an extensive technical program covering…

read more >

Offshore Energy Exhibition & Conference 2019

Offshore Energy thematic sessions addressed the full life-cycle in the oil and gas and energy industry, starting with Exploration…

read more >

OCEANS 2019

OCEANS is the bi-annual event for global marine technologists, engineers, students…

read more >