TechnipFMC Bags West White Rose EPCI Deal from Husky

TechnipFMC has been awarded an engineering, procurement, construction and installation (EPCI) contract from Husky Energy for the West White Rose project in Eastern Canada.

The contract covers the supply and installation of subsea equipment including tie-in manifolds, flexible flowlines, and control umbilicals, which will connect the West White Rose platform to the existing SeaRose floating, production, storage and offloading (FPSO) vessel.

Hallvard Hasselknippe, president Subsea Projects for TechnipFMC, said: “TechnipFMC is honored to be awarded the next phase in the Husky White Rose field development. It continues TechnipFMC’s strong positioning within Canada’s East Coast offshore industry.”

The Husky West White Rose project will use a fixed platform tied back to the SeaRose FPSO vessel.

The main White Rose field is located approximately 350 kilometers (217 miles) east of St. John’s, Newfoundland and Labrador, on the eastern edge of the Jeanne d’Arc Basin in water depths of about 120 meters (393 feet).

Share this article

Follow Subsea World News

Events>

<< Dec 2017 >>
MTWTFSS
27 28 29 30 1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31

Underwater Intervention 2018

UI 2018 will draw the industry’s leaders from across the country and around the globe to gather for 3 days of networking…

read more >

Future Energy Asia Exhibition & Conference (FEA) 2018

The transformation and development of Thailand is a major priority for the government which creates incredible business opportunities…

read more >

HYPACK 2018

This training event will offer instruction on the newest features of HYPACK® 2018 as well as comprehensive training for both novice…

read more >

European Gas Conference 2018

The European Gas Conference celebrated its tenth anniversary amid an air of increasing optimism following considerably shifting markets in the last few years…

read more >