Prysmian’s New Solution to Prevent Subsea Cables Damages

Prysmian has found a new solution to prevent subsea cables damages and minimize downtime and costs in the event of fault.

The new solution, named Power Link Cable Solutions, is a service capable of offering a complete set of cloud-based systems.

Power Link Cable Solutions provides a 24/7 wireless monitoring of subsea cables operating conditions, with the support of a dedicated team of technicians specialized in reading and interpreting the collected data.

The company has set up a marine base fully equipped with tools and facilities required for maintenance interventions.

The facility features a dedicated fleet with a semi-mobilized DP vessel and shallow water barge as well as spares storage and management with a permanent engineering and offshore installation team ready to take care of the projects.

The facility is located in Middlesbrough, UK.

Share this article

Follow Subsea World News

Events>

<< Aug 2019 >>
MTWTFSS
29 30 31 1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31 1

Submarine Networks World 2019

As the key annual gathering for decision makers in the subsea communications value chain, they offer a dedicated platform…

read more >

8th International Conference 2019 Offshore Wind Power Substations

The International Conference Offshore Wind Power Substations is a technical event for experts in the wind industry.

read more >

Wind Turbine Towers

Wind Turbine Towers is a technical event for experts in the wind industry and the goal is to push forward technical development for future tower concepts.

read more >

Seatrade Europe 2019

The three day event will  take place in the hub of the European cruise industry, Hamburg; Germany…

read more >