EEW SPC Manufactures Piles for Leviathan

EEW Special Pipe Constructions GmbH has received an order from the Dutch company Heerema Marine Contractors to manufacture 16 pin piles for the Leviathan project.

The Leviathan field is located about 125 km west of Haifa, Israel in the eastern Mediterranean and contains an estimated gas deposit of about 22 trillion cubic feet (621 BCM).

The piles are required for anchoring the Leviathan production platform in the seabed, the company explained.

The first pile which has a total length of 156 meters recently left the production halls. It is the longest steel pipe that the Rostock-based company has ever produced.

Two SPMTs, 84 m apart, were electronically coupled in order to transport the pile out of the hall. The remaining piles with total lengths of 148.7 and 156 meters respectively will be produced over the coming weeks.

In addition to the production of the piles, EEW SPC is also responsible for the production and installation of the sea-fastening.

Share this article

Follow Subsea World News

Events>

<< Sep 2018 >>
MTWTFSS
27 28 29 30 31 1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30

1ST NORWAY PUMPS & PIPES CONFERENCE

The primary goal is to bring together professionals from Energy and Medicine to transfer knowledge and share challenges…

read more >

RIO OIL & GAS 2018

The leading oil and gas event in Latin America is organized every two years by the Brazilian Petroleum, Gas and Biofuels Institute (IBP)…

read more >

Submarine Networks World 2018

In 2018, expect over 600 industry leaders from more than 300 organisations worldwide to gather once again in Singapore…

read more >

RPG 2018

Attending RPG 2018 will benefit international academics, researchers, engineers and consultants working in renewable energy…

read more >