Fugro Wraps Up Final Stage of Saint-Nazaire Survey

Photo: Fugro

Fugro has completed the final stage of geotechnical investigations to provide information for the detailed design of turbine foundations at the Saint-Nazaire offshore wind farm off the Atlantic coast of France.

The owner and developer of the 480MW wind farm, Parc du Banc de Guérande SAS (PBG), is a subsidiary of the EDF group and Canada’s Enbridge. A

Situated some 12km off the Loire-Atlantique coast of France, the Saint-Nazaire offshore wind is expected to power 20% of the Loire-Atlantique department.

Fugro performed the first geotechnical survey campaigns on the site in 2011, 2013 and 2015 surveying half the wind turbine positions and taking soil/rock samples.

Share this article

Follow Subsea World News

Events>

<< May 2019 >>
MTWTFSS
29 30 1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31 1 2

Global Petroleum Show (GPS)

The Global Petroleum Show Conference is a comprehensive three-day program where…

read more >

FPSO Brazil Congress 2019

Charging ahead with 24 planned orders by 2022, Brazil has once again solidified its status as one of the world’s foremost oil and gas leaders…

read more >

Decom Offshore 2019

As an established industry event, Decom Offshore 2019 provides delegates with the valuable opportunity to network…

read more >

OWI WA 2019

West Africa’s only dedicated Offshore Well Intervention Conference is returning for its second year…

read more >