Swan Hunter Wraps Up MOG Project Ops

Swan Hunter, along with its partner DOC, has completed load-in spooling operations for the Elia Modular Offshore Grid (MOG) project.

The contract was awarded to load-in and store 5km of the Modular Offshore Grid spare export cable from the Tideway Living Stone cable lay vessel.

Swan Hunter’s newest equipment fleet addition, the 1000Te modular carousel system was used in conjunction with a 15te shoreside tensioner, and loading lower, to spool the cable.

The liftable modular basket will be moved to final long term storage location with SPMTs later this month.

Director, Gerard Kroese said: “This is another fantastic example of well-executed project operations at our cable storage and spooling yard, which places it firmly on the map within the European offshore wind services supply chain. To have another flagship cable lay vessel at the yard, the Living Stone, which is brand new to the market, further confirms the flexibility and capability of our strategically placed facility and it’s attraction to installation contractors and offshore wind farm developers active in the market.” 

Share this article

Follow Subsea World News

Events>

<< Nov 2019 >>
MTWTFSS
28 29 30 31 1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 1

M&CCE Expo Marine & Coastal Civil Engineering 2020

This conferences, events, demos, and competitions provide a productive background buzz throughout M&CCE…

read more >

Underwater Intervention (UI) 2020

Underwater Intervention Conference is a conference where oil and gas industry professionals, senior decision…

read more >

Subsea Expo 2020

Subsea Expo is the world’s largest subsea exhibition and conference and is completely free to attend.

read more >

Oceanology International 2020

Exhibitors from industry, government and research institutions share their knowledge and come…

read more >