ASCO Ships Wrap Up 2nd Stage of Absheron Pipe Laying

Photo: ASCO

Azerbaijan Caspian Shipping CSJC (ASCO) has completed the second stage of pipe laying work in the Absheron gas and condensate field located in the Azerbaijan sector of the Caspian Sea.

At this stage, an 8-inch pipeline with a length of 11,459 meters was layed in the Absheron area between jackets No. 23 and No. 57.

Next stage includes pipe laying works at the Gas Separation Station No. 2 of the Bulla-Deniz field. It is planned to lay a pipeline with a length of 27 km.

The Suleiman Vazirov pipe-laying vessel and the Yarenga towing and supply vessel of the Caspian Sea Oil Fleet ASCO are used in pipe-laying works.

The Absheron gas and condensate field is located south-west of the block of Azeri-Chirag-Guneshli fields in the Caspian Sea at a depth of 500 meters. Pipe laying work was carried out at a depth of 8-12 meters.

Share this article

Follow Subsea World News

Events>

<< Sep 2019 >>
MTWTFSS
26 27 28 29 30 31 1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 1 2 3 4 5 6

Europort 2019

Europort, organised in the world port city of Rotterdam, will be the leading exhibition for special purpose vessels…

read more >

2019 SPE Annual Technical Conference and Exhibition (ATCE)

As one of the largest gatherings of E&P professionals, ATCE includes an extensive technical program covering…

read more >

Offshore Energy Exhibition & Conference 2019

Offshore Energy thematic sessions addressed the full life-cycle in the oil and gas and energy industry, starting with Exploration…

read more >

OCEANS 2019

OCEANS is the bi-annual event for global marine technologists, engineers, students…

read more >