Gas Leak at Visund Platform Stopped (Norway)

The gas leak that was reported at the Visund platform this morning was confirmed stopped just before 1pm today. Evacuated personnel will be returned to the platform.

The gas leak is believed to have started at a point in a fixed riser carrying oil and gas from well A21 to the Visund platform.

A gas leak at the Visund platform was reported at 8.18 this morning, and Statoil’s emergency preparedness organisation was immediately mobilised.

Of the 123 persons on board, 63 persons without emergency preparedness duties were evacuated to nearby installations.

As have previously communicated, no injuries were reported in connection with the incident.

The situation at Visund will now be gradually normalised.

Source: Statoil, April 9, 2011

Share this article

Follow Subsea World News

Events>

<< Jun 2015 >>
MTWTFSS
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 1 2 3 4 5

Offshore Well Intervention Asia Pacific

The OWI APAC workshop will take place on June 10-11 in Malaysia. The workshop will help you to improve planning for intervention projects…

read more >

Fundamentals of Subsea Integrity & Reliability

The course is delivered by distance learning so it does not disrupt your work or home life, and is an invaluable introduction to this vital…

read more >

Pipeline Engineering, Construction and Operations

Pipelines are generally the most economical way to transport large quantities of liquids and gases over land and below the sea, such as oil…

read more >

SPE LONDON ANNUAL CONFERENCE MAXIMISING VALUE IN UPSTREAM OIL & GAS

The conference includes seven sessions with topics and themes encompassing the global and regional opportunities landscape and major factors…

read more >