Deepwater Wind Proposes Route for Transmission Link (USA)

Rhode Island’s State Properties Committee is to examine Deepwater Wind’s request for connecting an offshore wind farm to the grid through Scarborough State Beach, the Providence Journal reports.

The company decided to go with burying the cable at the state beach after a strong opposition emerged over its plans to run the transmission link at the Narragansett Town Beach. “State property seemed the way to go since this project had been approved by the state,” Narragansett Town Council’s President James Callaghan says.

The new plan for the cable connection proposes a subsea route of 18 miles from Block Island to Scarborough. It would be connected to the mainland between two storm water outflow pipes north of the main beach area and the two pavilions there, writes the Providence Journal.

Subsea World News Staff, September 25, 2013

 

Share this article

Follow Subsea World News

Events>

<< Jun 2015 >>
MTWTFSS
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 1 2 3 4 5

Offshore Well Intervention Asia Pacific

The OWI APAC workshop will take place on June 10-11 in Malaysia. The workshop will help you to improve planning for intervention projects…

read more >

Fundamentals of Subsea Integrity & Reliability

The course is delivered by distance learning so it does not disrupt your work or home life, and is an invaluable introduction to this vital…

read more >

Pipeline Engineering, Construction and Operations

Pipelines are generally the most economical way to transport large quantities of liquids and gases over land and below the sea, such as oil…

read more >

SPE LONDON ANNUAL CONFERENCE MAXIMISING VALUE IN UPSTREAM OIL & GAS

The conference includes seven sessions with topics and themes encompassing the global and regional opportunities landscape and major factors…

read more >