GMC Wins Moho Nord Connector Deal

GMC Inc. announces the award of a contract to deliver its high strength fatigue resistant mechanical connector product as part of Total’s Moho Nord TLP project.

GMC will supply over 100 sets of its concentric thread, pin and box type connectors under contract to Hutchinson Offshore’s Techlam S.A. who are supplying the entire TLP tendon system to Hyundai Heavy Industries.

The 16,500-ton TLP hull and topsides will be vertically moored in over 780-meters water depth by the tendon tethering system. GMC’s high strength fatigue resistant mechanical connector will provide the intermediary connectors on the tendons.

The 24-inch OD connectors shall have a tension capacity rated at over 2000-tons.

The scope of supply includes the connectors, the make and break tool, and a tendon handling tool. GMC technicians will support Heerema on the tendon installation.

GMC is very pleased in the confidence that Total S.A. and HUTCHINSON Techlam S.A.S. have placed in us by selecting our superior connector product.

The mechanical connector product line continues to expand to provide new and improved technologies for the connection of pipelines, risers and structural tubulars in the offshore oil and gas industry.

GMC’s mechanical connector is fully tested to the ISO 21329:2004, Petroleum and natural gas industries – Pipeline transportation systems – Testing procedures for mechanical connectors and independently certified by Det Norske Veritas (DNV) in 2010.

Press Release, October 17, 2013; Image: GMC

 

Share this article

Follow Subsea World News

Events>

<< Jan 2016 >>
MTWTFSS
28 29 30 31 1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31

Topsides Platforms & Hulls

Topsides, Platforms & Hulls Conference & Exhibition is the offshore industry’s only event dedicated to the topsides, platforms and hulls…

read more >

20th Annual Offshore West Africa

The conference will provide the latest technological innovations, solutions and lessons learned from leading industry professionals and will…

read more >

2nd Annual Offshore Power Cable Engineering and Reliability Forum

This exclusive BIS forum will showcase an analytical insights into how industry leaders are reducing risk and improving efficiency during offshore power cable installation. Participants will learn how to increase cable integrity and manage cost during offshore projects. This interactive forum will explore effective and safe maintenance of offshore cables in deeper, harsher environments. With a two day intimate forum followed by half a day workshop, joining together key industry professionals to discuss, brainstorm, share experience and partake in exclusive networking sessions in a flexible and dynamic platform – together shaping the future of the market.

As Europe strives to meet its 2020 renewable targets the need for infrastructure increases and the integration of renewable energy into the European grid along with the necessity for trade is of huge importance. HVDC offshore cables are a vital investment; both of time and money, and any challenges arising could result in operational and financial losses. An insight on how to efficiently cope with the changes and keeping up with market trends is needed.

This BIS GROUP Forum will allow leading electricity cable and interconnection players to exchange and discuss experience on reliable offshore power cable monitoring, protection strategies, repair and installation technologies that are vital for operating in cost-efficient manner. The forum will also provide solutions and strategies on how to overcome the challenges of laying and installing of offshore power cables in deep water / far offshore.

KEY TOPICS INCLUDE:

  • Deepen your insight into the latest cable design advancements
  • Identify the latest technological innovations in cable laying & installation projects
  • Explore the possibilities of dynamic cables and deep water installation
  • Discover new generation of cost effective burial and trenching methods
  • Ease your cable protection strategy and save your resources
  • Explore how to use the latest monitoring and testing techniques to enhance cable repair
  • Gain invaluable insight into the latest maintenance methodologies to achieve cable integrity and reduce cost
  • Benefit from expert opinion on predictive and preventative maintenance strategy
  • Examine vessel capabilities and availabilities in offshore projects
  • Receive clarification on the roles and responsibilities of Marine Warranty Surveyor
  • Take advantage of an excellent opportunity to meet other stakeholders in an informal setting

More Info

read more >

Subsea South West Networking Event in Bristol

The event is being organised with a view to establish a Subsea South West group, to share information and services among companies which…

read more >