VIDEO: ‘Ceona Amazon’ Construction Continues

After being successfully floated at Crist Yard in Poland back in April, the Ceona Amazon was towed to Lloyd Werft Bremerhaven for extensive outfitting.

The 199-metre versatile deepwater field development vessel with her huge product carrying capacity (5,000t of flexible or 8,500t of rigid pipe) stored on and below her 4,600m² deck, twin 400t AHC Masthead cranes working in tandem lifting mode, her innovative on-vessel pipeline fabrication (welding, NDT and FJC) and superior operability (drill ship hull), is a breakthrough in offshore pipelay, heavy construction and floaters installation services.

Once completed in Germany she will move to Huisman yard in Schiedam (The Netherlands) for installation of a 570t pipelay tower and two 400t cranes before entering into operation early 2015.

Press Release, August 13, 2014

 

Share this article

Follow Subsea World News

Events>

<< May 2019 >>
MTWTFSS
29 30 1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31 1 2

Global Petroleum Show (GPS)

The Global Petroleum Show Conference is a comprehensive three-day program where…

read more >

FPSO Brazil Congress 2019

Charging ahead with 24 planned orders by 2022, Brazil has once again solidified its status as one of the world’s foremost oil and gas leaders…

read more >

Decom Offshore 2019

As an established industry event, Decom Offshore 2019 provides delegates with the valuable opportunity to network…

read more >

OWI WA 2019

West Africa’s only dedicated Offshore Well Intervention Conference is returning for its second year…

read more >