Mubadala Starts Manora Drilling

Mubadala Petroleum, Operator of the Manora Oil Development joint venture, has advised that the Atwood Orca jackup drilling unit spudded the first of 15 planned development wells, MNA-02.

The MNA-01 and MNA-02 wells will be batch drilled to final total depths of 2,104 m and 2,441 m measured depth respectively and shall be completed with electric submersible pumps (ESPs) ahead of handover to Production. Drilling and completion of both wells is planned to take 24 days on a trouble free basis.

Both wells are required ahead of introduction of hydrocarbons to the Manora production facility. Production is expected to occur shortly after the completion of the MNA-01 and MNA-02 wells.

The Manora A platform is located within the Gulf of Thailand in 46 metres of water. The development drilling program calls for drilling and completion of 15 wells (10 producers and 5 injectors), with the program expected to take until the end of Q1 2015.

Press Release, September 05, 2014

 

Share this article

Follow Subsea World News

Events>

<< May 2015 >>
MTWTFSS
27 28 29 30 1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31

Offshore Well Control 2015

Safety Culture: Access innovative case studies on safety culture and leadership to ensure quality control, risk mitigation and process…

read more >

Fundamentals of Offshore Field Development

The course delivers the detailed knowledge required, along with management strategies, for you to successfully engage in the sector…

read more >

Fundamentals of Subsea Integrity & Reliability

The course is delivered by distance learning so it does not disrupt your work or home life, and is an invaluable introduction to this vital…

read more >

Pipeline Engineering, Construction and Operations

Pipelines are generally the most economical way to transport large quantities of liquids and gases over land and below the sea, such as oil…

read more >