Petrojarl Knarr FPSO Arrives at Aibel for Final Preparations

The new floating production vessel Petrojarl Knarr has arrived from Korea at Aibel’s shipyard in Haugesund. Here the ship will be prepared before installation on the Knarr field.

The assignment contributes to full employment at the yard for the upcoming weeks, before Petrojarl Knarr once again leaves Aibel by the end of September, according to plan.

The preparation of Petrojarl Knarr emphasizes Aibel’s expertise in terms of the requirements on the Norwegian continental shelf. It also speaks volumes of the company’s versatile expertise and capacity at the shipyard in Haugesund.

petrojarl

Petrojarl Knarr was built by Samsung in Korea for Teekay. The floating production vessel is 256 metres long and 48 metres wide. The ship has a production capacity of 63,000 barrels a day, and a storage capacity of 800,000 barrels. Petrojarl Knarr will operate on the Knarr field located west of Florø. Operator is BG Norge.

Press Release, September 17, 2014

 

Share this article

Follow Subsea World News

Events>

<< Aug 2018 >>
MTWTFSS
30 31 1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31 1 2

The European Corrosion Congress – EUROCORR

The European Corrosion Congress – EUROCORR, the EFC’s annual conference, is the flagship event of the European corrosion calendar…

read more >

ONS 2018

Offshore Northern Seas (ONS) provides a platform for the presentation of the political, economic and technological issues involving…

read more >

FPSO World Congress 2018

FPSO World Congress 2018 will take a closer look at the overall life-cycle of an FPSO…

read more >

EIC Connect Oil & Gas USA 2018

EIC Connect Oil & Gas USA 2018 is the Energy Industries Council’s (EIC) not-for-profit event designed to promote…

read more >