Statoil to Plug Oseberg Well

Untitled-1

Statoil has received consent to use Songa Trym for permanent well plugging on the Oseberg field.

Statoil is the operator on the Oseberg field, located in blocks 30/6 and 30/9 in the northern part of the North Sea.

Well 30/6-B-51 AH is a subsea well tied to the Oseberg A facility. The well was drilled in 1996, but has not produced since 2007. There have been integrity problems in the well, and Statoil has decided to plug it permanently.

The PSA has now granted Statoil consent to use the Songa Trym mobile drilling facility to plug the well.

Statoil has allocated 45 days for the activity, which will start in late October. Water depth at the site is around 105 metres.

Press Release

 

Share this article

Follow Subsea World News

Events>

<< Jun 2015 >>
MTWTFSS
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 1 2 3 4 5

1st EUROPE OIL GAS TRAINING SIMULATION FORUM

The event – unique in its kind around the world – will be an excellent platform for networking, benchmarking, exchanging business ideas…

read more >

Pipeline Engineering, Construction and Operations

Pipelines are generally the most economical way to transport large quantities of liquids and gases over land and below the sea, such as oil…

read more >

Marine Warranty Surveying

Marine warranty surveyors ensure that best industry practice and correct procedures are followed in the planning and execution of critical…

read more >

Practical Seismic Interpretation with Petrel

The course will cover the essential Geological and Geophysical information necessary to visualize and interpret seismic data…

read more >