VARD to Build OSCV for Farstad

VARD to Build Offshore Subsea Construction Vessel for Farstad

Vard Holdings Limited, one of the major global designers and shipbuilders of offshore and specialized vessels, has secured a contract for the design and construction of one Offshore Subsea Construction Vessel (OSCV) for Farstad Shipping.

The vessel will be of VARD 3 17 design, with a total length of 98 meters and a beam of 21.5 meters, and has been developed especially for subsea and IMR operations. It is arranged for two ROVs (Remote Operating Vehicles) and features a 150 ton active heave compensated offshore crane.

The vessel was designed by Vard Design in Ålesund, Norway, in close cooperation with Farstad and Technip. Farstad has been awarded a five year framework agreement by Technip Norge for delivery of ROV support operations, light construction work, IMR and other subsea related activities, which will be fulfilled with this newbuild vessel. Delivery is scheduled from Vard Vung Tau in Vietnam, in 4Q 2016.

VARD CEO and Executive Director Roy Reite says, “We appreciate the long-term relationship we have with Farstad, and this cooperation has once again resulted in a new and innovative project. We would like to congratulate the Farstad team with the five years’ agreement for this vessel with Technip.”

Farstad Shipping’s fleet currently consists of 62 vessels (32 AHTS, 26 PSV and 4 Subsea) and 3 Subsea vessels (including the above) under construction.

Press Release

Share this article

Follow Subsea World News

Events>

<< Mar 2015 >>
MTWTFSS
23 24 25 26 27 28 1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 31 1 2 3 4 5

OMC 2015

OMC 2013 reached over 13,700 participants, an increase of 31% compared to 2011, from 32 countries worldwide, a sign that both the conference…

read more >

Transnational Oil, Gas and Energy Law

Study a Unique Online Learning Programme that is Highly Relevant to Today’s International Market…

read more >

Heavy Transport & Lifting for Oil, Gas and Marine by Richard Krabbendam

Building a lift plan
Choosing the right crane
Using a tail crane
Selecting the right platform trailer or SPMT
Estimating forces in lifting…

read more >

MCE Deepwater Development 2015

Marine, Construction & Engineering (MCE) Deepwater Development is recognized as the leading conference addressing technical issues related…

read more >