Huisman Installs ‘Ceona Amazon’ Pipelay System

Huisman Equipment has installed the 570mt Pipelay System onboard Ceona’s Ceona Amazon at the Huisman Schiedam quayside, the company informed through their social media.

In December last year, Huisman welcomed Ceona’s Amazon newbuild pipelay vessel following it’s delivery and christening in Bremerhaven.

The vessel’s outfitting at Bremerhaven followed successful floatation at Crist yard in Poland earlier this year in April before all major machinery, equipment and the helideck were installed in Germany.

The Ceona Amazon is 199.4 metres long and 32.2 metres wide, drawing 8.0 metres with a gross tonnage of 33,000. The vessel is due to enter service early 2015.

With capacity to carry 8,500 tonnes of pipe, the Ceona Amazon will be able to lay rigid and flexible pipelines and umbilicals, and install heavy subsea structures or floaters (TLP, semi or FPSO) using its two 400 tonne subsea cranes working in tandem.

Subsea World News Staff; Image: Douglas Neil Robertson

Share this article

Follow Subsea World News

Events>

<< Sep 2019 >>
MTWTFSS
26 27 28 29 30 31 1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 1 2 3 4 5 6

Europort 2019

Europort, organised in the world port city of Rotterdam, will be the leading exhibition for special purpose vessels…

read more >

2019 SPE Annual Technical Conference and Exhibition (ATCE)

As one of the largest gatherings of E&P professionals, ATCE includes an extensive technical program covering…

read more >

Offshore Energy Exhibition & Conference 2019

Offshore Energy thematic sessions addressed the full life-cycle in the oil and gas and energy industry, starting with Exploration…

read more >

OCEANS 2019

OCEANS is the bi-annual event for global marine technologists, engineers, students…

read more >