AMBAU Bags ‘Nordsee One’ Job

Nordsee One GmbH of Hamburg has contracted AMBAU GmbH to design and produce 54 monopiles and transition pieces for „Nordsee One“ project.

Starting in June 2015, 54 monopiles and transition pieces for the “Nordsee One”project will be produced in the AMBAU facilities in Bremen and Cuxhaven on behalf of Nordsee One GmbH.

These 54 foundations consist of a total mass of approximately 50.000 tones of steel. The monopiles and transition pieces will be screwed together and will be equipped with an innovative sealing
system that has been jointly invented and successfully tested with engineers of RWE Innogy and AMBAU in AMBAU’s facility in Bremen.

In October 2014, AMBAU has already started with the “Detailed Design” of the foundations and is about to be certified. “Delivering an optimized and certifiable design of the foundations additionally to the production itself is a challenging and technically demanding task for AMBAU”, describes Rainer Wirth, Head of Engineering of AMBAU the engineering process.

The foundations will be installed approximately 40 kilometers north of Juist Island in German territorial waters. Once operational, “Nordsee One” with its 54 wind mills is expected to generate over 1.200 gigawatt hours of electricity per year, enough to meet the needs of approximately 400.000 German households.

Share this article

Follow Subsea World News

Events>

<< Jun 2019 >>
MTWTFSS
27 28 29 30 31 1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30

OGA 2019

Malaysia’s Oil, Gas and Energy (OGE) industry has been contributing about one-fifth to the national GDP…

read more >

SEANERGY 2019

Seanergy is the international forum dedicated to Offshore Wind and Marine Renewable Energy.

read more >

Global Petroleum Show (GPS)

The Global Petroleum Show Conference is a comprehensive three-day program where…

read more >

Underwater Technology Conference (UTC)

UTC 2019 will be the 25th Underwater Technology Conference, and 500 professionals…

read more >