Technip Bags Contract Extension for Logistic Base in Brazil

Vitória - Flexible pipe manufacturing facility

Technip has signed a four years extension of its five-year initial contract signed in January 2011 with Petrobras for its Flexible Pipes Logistic Base (BAVIT), located in Vitória, Brazil.

The scope covers storage, handling, inspection, testing, load-out (two simultaneous vessel load-out points), internal cleaning and maintenance of flexibles pipes.

The base has a 300t handling capacity, storage capacity for 220 reels and serves as the main load-out point for all pre-salt flexible pipes.

Adriano Novitsky, president of Technip in Brazil, said: “Technip is very proud of this contract. In 2016, the logistic base has reached the significant milestone of eight years of operation without lost time injury. This achievement demonstrates that the culture of HSE has become sustainable and the renewal of this contract is a demonstration that we have been performing as expected by our client, ensuring high standards of quality and safety in the operations.”

Share this article

Follow Subsea World News

Events>

<< Mar 2017 >>
MTWTFSS
27 28 1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31 1 2

Ocean Business 2017

Ocean Business 2015 was phenomenally successful, with visitor numbers up an incredible 29%. The overall attendance was a staggering 4,589…

read more >

Invitation to Free Dynamic Positioning Event in Aberdeen

The seminar will provide a brief overview of DP Vessels and their Control Systems - how they function…

read more >

NGV Global 2017

The NGV GLOBAL 2017 Conference will bring together leaders in the world natural gas for vehicles to discuss current trends, development…

read more >

OMC 2017

OMC mission is serving all people interested in the Mediterranean Offshore Industry…

read more >