Ecosse Wraps Up 2nd Seabed Clearance on Race Bank OWF

Ecosse Subsea Systems (ESS) has completed second seabed clearance project on behalf of DONG Energy on the Race Bank offshore wind farm.

ESS cleared more than 3000 boulders at the wind farm site, located off the Norfolk and Lincolnshire coast.

Race Bank will consist of 91 turbines of 6MW each and generate enough electricity to power more than 500,000 homes.

ESS teams mobilized several vessels including Siem Topaz and Siem Sapphire for the work.

The company deployed the latest version of its SCAR 2 seabed system, while an ROV grab was used to remove boulders and debris.

The boulder clearing took place across the export corridor, array cable routes and turbine locations, with 30-meter plus clearance corridors created using multi-pass capability, the company explained.

 

DONG Energy senior project manager, Luke Bridgman, said: “Ecosse has done an excellent job preparing the seabed for our arrays, export cable and foundation installation.”

Share this article

Follow Subsea World News

Events>

<< Dec 2018 >>
MTWTFSS
26 27 28 29 30 1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31 1 2 3 4 5 6

All-Energy 2019

All-Energy is the UK’s leading renewable energy and low carbon innovation event, showcasing the latest technologies and services…

read more >

ACENS 2019

Submission shall pass the double blind paper review first in order to be presented in the conference…

read more >

Deepwater Operations Advisory Board

This event allows for the free and open exchange of ideas, as proceedings will not…

read more >

Subsea Tieback Forum & Exhibition

The content addresses new operational issues, challenges, and solutions associated with global deepwater subsea operations…

read more >