InterMoor Delivers Erha FPSO Job

GMT Energy Resources commissioned InterMoor for some mooring integrity work on the Erha FPSO, on behalf of Esso Exploration and Production Nigeria Limited (EEPNL).

The FPSO is located 97 kilometers off the Nigerian coast in the Erha field, in about 1168 meters of water.

The production asset has a designed storage capacity of 2.2 million barrels of crude oil, and its designed oil processing capacity is 210,000 barrels per day (bpd).

InterMoor’s original scope of work included replacement of the top chain on 3 of the 12 mooring lines (130 m length, 132 mm diameter), project management & engineering, as well as procurement and logistics to deliver the installation aids and rigging equipment to Nigeria.

The scope was later extended to include procurement of air tugger for the Erha FPSO and its installation, replacement of the FPSO mooring winch wire, deck cleaning and grinding, removal of the old chains from chain lockers, winch load test, and procurement and installation of an emergency towing line to the standby vessel for emergency station keeping.

The work was completed in February this year.

Share this article

Follow Subsea World News

Events>

<< Mar 2019 >>
MTWTFSS
25 26 27 28 1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31

Subsea Valley

This yearly gathering has grown from 200 to 2000 delegates in only 5 years and is now one of the leading energy conferences in Europe…

read more >

Shallow and Deepwater Mexico Oil and Gas Conference

Shallow and Deepwater Mexico is a community gathering for the offshore sector focusing on the future of offshore in Mexico…

read more >

OMC 2019

OMC is the largest exhibition and conference dedicated to the Offshore, and Oil & Gas Industry…

read more >

SubOptic 2019

SubOptic is the longest running and most comprehensive conference series in the world for the submarine fiber industry…

read more >