Demand for high-voltage submarine electricity cables is growing steadily, as countries and regions make commitments ...
read more →
A consortium comprising of Marubeni (project integrator), the University of Tokyo (technical advisor), Mitsubishi, ...
read more →
Emperor cable cleats from Yorkshire manufacturer, Ellis are being installed on RWE npower renewables’ Gwynt y Môr ...
read more →
In just 16 days, during the second visit to the Global Tech I construction site, three more foundations were ...
read more →
Yesterday U.S. Ambassador to Tanzania Alfonso E. Lenhardt and Zanzibar President Mohammed Shein witnessed the ...
read more →
At the beginning of August, MV “Lone” loaded two reels, each of 800 mtons and a diameter of 28.5 m, in Pori, ...
read more →
The last of the 111 transition pieces has now been installed on monopile no. 111 in Anholt Offshore Wind Farm. This ...
read more →
On 18 June Thialf, one of the world’s biggest heavy lift vessels, lifted the 9,000 tonne steel jacket into position ...
read more →
There are great things happening aboard the vessel “Havila Phoenix” nowadays. During the last two years ...
read more →
The installation of the second of the four export cables on London Array Offshore Wind Farm that will connect the ...
read more →
With its ability to detect ocean events ranging from sewage spills to harmful algal blooms, MBARI’s ...
read more →
A cutting-edge new system, designed to train engineers and crew in seismic streamer deck handling has been ...
read more →