AWE Continues F10 Reservoir Drilling at Pateke-4H
AWE Limited reported that the Pateke-4H development well was at a measured depth of 3,863m and drilling ahead on ...
read more →AWE Drills Second Sidetrack on Pateke-4H Development Well
AWE Limited reports that as at 06:00 hours (6.00am NZDT) preparations were being made to drill a second sidetrack ...
read more →AWE Continues Pateke-4H Operation with Horizontal Drilling
AWE Limited reported Pateke-4H development well sidetrack has been drilled to a measured depth of 4,083m, landing ...
read more →Indications of Presence of Oil Bearing Reservoir at ...
AWE Limited reports that as at 06:00 hours (6.00am NZDT), the Pateke-4H development well sidetrack was at a ...
read more →AWE Experiences Mechanical Difficulties at Pateke-4H
AWE Limited reported that the Pateke-4H development well was preparing to sidetrack a short section of lower ...
read more →Subsea Tree Successfully Installed at Pateke-4H Well ...
AWE Limited reports that as at 06:00 hours (6.00am NZDT) today, the Pateke-4H development well was at a measured ...
read more →


