Aluminum Alloy Drill Pipe Supports BSP’s Operations Offshore Brunei

Aluminum Alloy Drill Pipe Supports BSP's Operations Offshore Brunei

Alcoa announced that its Alcoa Oil & Gas business has successfully deployed 1800 meters (5,905 feet) of Aluminum Alloy Drill Pipe (AADP®) in the Iron Duke Well C offshore Seria, Brunei. Alcoa partnered with Brunei Shell Petroleum Co. Sdn. Bhd. (BSP), the largest oil and gas producer in Brunei, and AMRTUR Corp., Alcoa’s service partner, on the project.

The well is considered among the most complex and deviated in the BSP system, with three “S” curves and a long horizontal section of approximately 5,000 meters, or about 3 miles long. It was successfully drilled to a total depth of 7,485 meters (4.6 miles) in about 60 meters (197 feet) of water.

“The Alcoa Aluminum Alloy Drill Pipe, which is produced in 30-foot (9.1-meter) aluminum tube sections and joined together using standard steel connections, is about 40 percent lighter than all steel pipes and has the potential to significantly reduce drill string hook load and related drilling torque and drag,” said Jay Grissom, Alcoa Oil & Gas Marketing Director.

Alcoa’s innovative and proprietary drill pipe starts with a tapered, high strength, aluminum alloy tube. This tube is coupled with a steel tool joint using a proprietary thermal connection technology that allows steel tool joints to be attached to the aluminum pipe body. Alcoa produces the aluminum tubes at its Lafayette, Indiana, facility and assembles the finished drill pipe at its Oil & Gas facility in Houston, Texas.

“We are constantly challenged to push the drilling envelope further to maximize recovery and minimize cost,” said Shayne Dustin, BSP’s Senior Well Engineer. “Light alloy pipe was listed as a performance opportunity to help us tackle some of the challenges we face with reduced cantilever loading, high torque, high drag, high sideforce, and casing wear concerns. Without a light alloy alternative, the furthest reaches of the platform would require a modification to well design.”

Brunei Shell plans to use AADP® on additional wells in Brunei. Shell is also planning a drilling project using AADP® in New Zealand.

AMRTUR led the staging, inspection, maintenance, and deployment of the aluminum drill string. “The rapid deployment of the Alcoa Alloy Aluminum Drill Pipe with BSP is an excellent example of the technology and service advantage AMRTUR can bring to its clients. I look forward to working with Alcoa and BSP to expand the use of the drill pipe in Southeast Asia and the Pacific region,” said Lieutenant Colonel (ret.) Mahmod “Max” Yakop, Managing Director of AMRTUR.

Press Release, August 09, 2012

Share this article

Follow Subsea World News

Events>

<< Mar 2015 >>
MTWTFSS
23 24 25 26 27 28 1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 31 1 2 3 4 5

OMC 2015

OMC 2013 reached over 13,700 participants, an increase of 31% compared to 2011, from 32 countries worldwide, a sign that both the conference…

read more >

Transnational Oil, Gas and Energy Law

Study a Unique Online Learning Programme that is Highly Relevant to Today’s International Market…

read more >

Heavy Transport & Lifting for Oil, Gas and Marine by Richard Krabbendam

Building a lift plan
Choosing the right crane
Using a tail crane
Selecting the right platform trailer or SPMT
Estimating forces in lifting…

read more >

MCE Deepwater Development 2015

Marine, Construction & Engineering (MCE) Deepwater Development is recognized as the leading conference addressing technical issues related…

read more >