VIDEO: CPM’s Deployment of Tidal Generator in Cobscook Bay

In 2012, CPM Constructors was the contractor on an innovative clean energy project in Eastport, Maine. CPM constructed and deployed the first licensed, grid connected tidal generator in the United States.

CPM began assembly of the 46.5-ton bottom support frame for ORPC’s TidGen™ Power System in February 2012. The following month, CPM installed the frame on the ocean floor and drove ten piles to secure it at a depth of 90 feet below low water.

Starting in June 2012, CPM erected the 41.5-ton TidGen™ turbine generator unit (TGU) at the company’s facility in Eastport, Maine, and laid 4,000 feet of bundled underwater power and data cables beneath the ocean floor to connect the TidGen™ Power System to ORPC’s on-shore station.

On August 14, CPM joined the TidGen™ TGU to the already-installed bottom support frame in Cobscook Bay, and within a month, the system was sending power to the grid.

March 25, 2013; Image: CPM

Share this article

Follow Subsea World News

Events>

<< Jul 2016 >>
MTWTFSS
27 28 29 30 1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31

SPE Intelligent Energy International

SPE Intelligent Energy International consists of an SPE produced technical conference and a world-class exhibition positioned at the forefront…

read more >

Subsea systems

Developing your knowledge of the equipment used, market drivers and issues affecting subsea production, this course covers subsea systems…

read more >

12th Annual Deepwater Intervention Forum

The 12th Annual Deepwater Intervention Forum presented a first-hand look at emerging and proven technologies which offered real-world…

read more >

ONS 2016

The ONS Conference is known as one of the world’s most important oil, gas and energy fora, giving the delegates a sneak peek into the future…

read more >