Production of Jackets Well Under Way at Bladt, Denmark

Bladt’s new facilities at Lindø Industrial Park are nearly all set and the production of the 41 jackets for ENBW Baltic 2 offshore wind farm is well under way.

At the moment, almost 100 men are in full swing in the workshops where they have spent the last months preparing these with the so called “jigs” – steel stands that have been cast into the floor and which are now being used during the production of part of the steel structures for the many jackets.

All across the line, Bladt employees are working hard to have the first jackets ready before the turn of the year.

The EnBW Baltic 2 offshore wind farm is the second offshore wind farm in the German Baltic Sea. The wind farm is located about 32 km north of Ruegen Island in the western part of the Baltic Sea. With a total of 80 wind turbines of 3.6 MW each, EnBW Baltic 2 will have a total capacity of 288 MW.

Press Release, August 29, 2013; Image: Bladt

 

Share this article

Follow Subsea World News

Events>

<< Jun 2015 >>
MTWTFSS
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 1 2 3 4 5

SPE LONDON ANNUAL CONFERENCE MAXIMISING VALUE IN UPSTREAM OIL & GAS

The conference includes seven sessions with topics and themes encompassing the global and regional opportunities landscape and major factors…

read more >

Fundamentals of Subsea Integrity & Reliability

The course is delivered by distance learning so it does not disrupt your work or home life, and is an invaluable introduction to this vital…

read more >

Pipeline Engineering, Construction and Operations

Pipelines are generally the most economical way to transport large quantities of liquids and gases over land and below the sea, such as oil…

read more >

OGA 2015 – THE BIGGEST OIL AND GAS SHOW

The OGA series, The Region’s No 1 Oil and Gas Event is the biggest and most comprehensive event in the Asian region which hosts exhibitors…

read more >